Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000346/LER-1993-001, :on 930219,discovered That Door to Emergency Airlock Vestibule Was Not Locked Since 930217.Caused by Insufficient Training.Personnel Trained & Sign Will Be Installed Near Door + (11:21:03, 20 December 2024)
- ML20034H956 + (11:21:04, 20 December 2024)
- ML20034H954 + (11:21:13, 20 December 2024)
- ML20034H952 + (11:21:19, 20 December 2024)
- ML20034H951 + (11:21:25, 20 December 2024)
- ML20034H949 + (11:21:31, 20 December 2024)
- 0CAN039303, Forwards Update on Status of Historical Commitments from 1985 to Present,Which Require Clarification or Change + (11:21:37, 20 December 2024)
- ML20034H945 + (11:21:44, 20 December 2024)
- ML20034H944 + (11:21:50, 20 December 2024)
- ML20034H943 + (11:21:56, 20 December 2024)
- ML20034H942 + (11:21:57, 20 December 2024)
- BECO-LTR-93-036, 1992 Statistical Summary Rept + (11:22:03, 20 December 2024)
- ML20034H940 + (11:22:05, 20 December 2024)
- ML20034H939 + (11:22:05, 20 December 2024)
- ML20034H937 + (11:22:06, 20 December 2024)
- ML20034H936 + (11:22:07, 20 December 2024)
- 05000336/LER-1993-003, :on 930217,discovered That Mispositioned HPSI Valve Would Have Rendered Facility 1 HPSI Sys Inoperable Due to Inadequate Procedural Guidance.Affected Valve Returned to Correct Position & Appropriate Sps Revised + (11:22:13, 20 December 2024)
- 05000440/LER-1993-007, :on 930218,determined That Snubbers May Have Been Inoperable Since 1992 Nonconformance Rept.Caused by Dried Out Lubricant Resulting from Exposure to Elevated Temps.All Snubbers Will Be Functionally Tested + (11:22:21, 20 December 2024)
- ML20034H931 + (11:22:31, 20 December 2024)
- ML20034H927 + (11:22:48, 20 December 2024)
- ML20034H928 + (11:22:48, 20 December 2024)
- 05000334/LER-1993-003-01, :on 930217,electrical Noise Spike Caused Spurious High Radiation Alarm on CR Radiation Monitor & Actuated CR Emergency Habitability Sys.Operating Procedure 1/2.44.4A Performed + (11:22:55, 20 December 2024)
- ML20034H925 + (11:23:01, 20 December 2024)
- ML20034H923 + (11:23:07, 20 December 2024)
- PY-CEI-NRR-1627, Forwards Licensee Events Repts 92-020-01 & 93-007 for Perry Nuclear Power Plant + (11:23:13, 20 December 2024)
- ML20034H919 + (11:23:15, 20 December 2024)
- ML20034H918 + (11:23:21, 20 December 2024)
- SNRC-2043, Informs NRC of Organizational Changes to Shoreham Decommissioning Project.Nuclear Engineering Div & Decommissioning Engineering Div Consolidated + (11:23:27, 20 December 2024)
- 05000334/LER-1993-004, :on 930218,condition Identified Which Could Have Prevented Fulfillment of Sys to Control Release of Radioactive Matl.Eops Revised to Diagnose Problems Based on Increasing VCT Level + (11:23:35, 20 December 2024)
- ML20034H914 + (11:23:41, 20 December 2024)
- ML20034H912 + (11:23:47, 20 December 2024)
- ML20034H911 + (11:23:53, 20 December 2024)
- ML20034H910 + (11:24:02, 20 December 2024)
- SNRC-2052, Forwards Listing of Nuclear Property Insurance in Force at Shoreham Nuclear Power Station + (11:24:09, 20 December 2024)
- 05000369/LER-1993-002-01, :on 930216,discovered Portion of Containment Spray Sys Channels Between Process Instrumentation & ESF Actuation Logic Improperly Tested.Caused by Deficient Written Communications.Procedures Changed + (11:24:13, 20 December 2024)
- ML20034H905 + (11:24:18, 20 December 2024)
- ML20034H903 + (11:24:21, 20 December 2024)
- ML20034H902 + (11:24:23, 20 December 2024)
- 05000341/LER-1993-004, :on 930219,electrician Located & Connected Test Equipment to Incorrect Auxiliary Relay,Resulting in Loss of 4,160-volt Ac Bus 69J.Caused by Personnel Error.Training on self-checking & Trip Relays Held + (11:24:25, 20 December 2024)
- 05000413/LER-1993-003, :on 930216,discovered That Portion of CS Sys Channels Between Process Instrumentation & Esfa Not Properly Performed Due to Deficient Written Communication.Procedures Revised to Include Circuit Continuity Checks + (11:24:27, 20 December 2024)
- ML20034H898 + (11:24:34, 20 December 2024)
- ML20034H897 + (11:24:40, 20 December 2024)
- 05000324/LER-1993-002-02, :on 920421,inadvertent ESF Actuation During Surveillance Testing Due to Test Lead Contacting Ground. Fuse Replaced in Accordance W/Work Request/Job Order 93-AGAY1 + (11:24:46, 20 December 2024)
- ML20034H895 + (11:24:53, 20 December 2024)
- 05000373/LER-1993-006, :on 930216,Group I Isolation Occurred.Caused by Inadequate Directions within Procedure.Validity of Actuation Verified & Isolation Reset + (11:24:59, 20 December 2024)
- ML20034H890 + (11:25:06, 20 December 2024)
- ML20034H888 + (11:25:12, 20 December 2024)
- PNO-V-93-009A, on 930314,operators at Unit 2 Observed Decreasing Pressurizer Level & Pressure & Manually Tripped Reactor.Licensee Declared Alert & Initiated Actions as Prescribed by Emergency Operating Procedures + (11:25:19, 20 December 2024)
- IR 05000461/1993004 + (11:25:27, 20 December 2024)
- ML20034H881 + (11:25:33, 20 December 2024)
- ML20034H879 + (11:25:39, 20 December 2024)