Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035C087 + (10:30:09, 20 December 2024)
- ML20035C084 + (10:30:17, 20 December 2024)
- ML20035C083 + (10:30:18, 20 December 2024)
- ML20035C080 + (10:30:24, 20 December 2024)
- ML20035C071 + (10:30:31, 20 December 2024)
- ML20035C069 + (10:30:32, 20 December 2024)
- BECO-LTR-93-044, Annual Dose Assessment to General Public from Radioactive Effluents,920131-1231. W/ + (10:30:45, 20 December 2024)
- ML20035C066 + (10:30:52, 20 December 2024)
- IR 05000395/1993008 + (10:30:58, 20 December 2024)
- ML20035C062 + (10:31:05, 20 December 2024)
- ML20035C060 + (10:31:11, 20 December 2024)
- ML20035C058 + (10:31:17, 20 December 2024)
- 05000370/LER-1993-002-02, :on 930309,discovered Unit 2 Manual Trip Initiated Due to Equipment Failure.Personnel Implemented Procedures EP/2/A/5000/01 & EP/2/A/5000/1.3 & Stabilized Unit in Mode 3 + (10:31:23, 20 December 2024)
- IR 05000324/1993012 + (10:31:29, 20 December 2024)
- ML20035C054 + (10:31:36, 20 December 2024)
- ML20035C052 + (10:31:42, 20 December 2024)
- 05000369/LER-1993-001-03, :on 930302,discovered That TS Required Surveillance Were Not Performed Due to Test Circuit Wiring Error Because of Vendor Fabrication Deficiency.Cabinet Was Installed & Tester Circuit Wiring Was Corrected + (10:31:48, 20 December 2024)
- ML20035C049 + (10:31:54, 20 December 2024)
- ML20035C044 + (10:32:00, 20 December 2024)
- IR 05000416/1992028 + (10:32:09, 20 December 2024)
- ST-HL-AE-4390, Lists Property Insurance Currently in Force,Including Ani/ Maelu Policies 93-201 & X93-201 & NEIL-II Policy X92-075 + (10:32:16, 20 December 2024)
- ML20035C039 + (10:32:29, 20 December 2024)
- IR 05000338/1993013 + (10:32:35, 20 December 2024)
- ML20035C034 + (10:32:42, 20 December 2024)
- ML20035C032 + (10:32:48, 20 December 2024)
- ML20035C031 + (10:32:54, 20 December 2024)
- TAC:M85482 + (10:32:55, 20 December 2024)
- ML20035C028 + (10:33:00, 20 December 2024)
- ML20035C027 + (10:33:06, 20 December 2024)
- IR 05000313/1993003 + (10:33:12, 20 December 2024)
- IR 05000160/1993001 + (10:33:19, 20 December 2024)
- IR 05000333/1993005 + (10:33:28, 20 December 2024)
- PNO-I-93-017, on 930326,six Lamb Carcasses Containing Licensed Matl Mistakenly Shipped from Facility W/Other Biohazard Carcasses.Caused by Freezer Normally Used for Radioactive Matl Not Being Operational.Meeting Held 930329 + (10:33:35, 20 December 2024)
- ML20035C021 + (10:33:41, 20 December 2024)
- ML20035C019 + (10:33:47, 20 December 2024)
- ML20035C018 + (10:33:53, 20 December 2024)
- ML20035C014 + (10:34:06, 20 December 2024)
- PNO-IV-93-013, on 930330,low Magnitude Earthquake Occurred at Plant.Notification of Unusual Event Declared Immediately. Extensive Plant Tours & Surveillance Tests Conducted to Ensure That safety-related Equipment Unaffected + (10:34:13, 20 December 2024)
- IR 05000220/1993002 + (10:34:19, 20 December 2024)
- ML20035C011 + (10:34:29, 20 December 2024)
- ML20035C007 + (10:34:43, 20 December 2024)
- ML20035C002 + (10:34:49, 20 December 2024)
- IR 05000271/1993004 + (10:34:56, 20 December 2024)
- ML20035B997 + (10:35:03, 20 December 2024)
- ML20035B996 + (10:35:10, 20 December 2024)
- ML20035B995 + (10:35:16, 20 December 2024)
- ML20035B993 + (10:35:22, 20 December 2024)
- ML20035B992 + (10:35:28, 20 December 2024)
- ML20035B991 + (10:35:37, 20 December 2024)
- 05000455/LER-1993-002-08, :on 930311,determines Unit 1 Essential Svc Water Pump Availability to Unit 2 Surveillance Not Complete. Caused by Failure to Complete Requirements of Shift/Daily Operating Surveillance.Surveillance Revised + (10:35:43, 20 December 2024)
- IR 05000155/1993005 + (10:35:50, 20 December 2024)