Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 91-16, Licensed Operators' and Other Nuclear Facility Personnel Fitness for Duty + (01:01:58, 19 February 2020)
- NRC Generic Letter 91-15, Operating Experience Feedback Report, Solenoid-Operated Valve Problems at U.S. Reactors + (01:02:06, 19 February 2020)
- NRC Generic Letter 91-14, Emergency Telecommunications + (01:02:14, 19 February 2020)
- NRC Generic Letter 91-13, Request for Info Related to the Resolution of GI 130, "Essential Service Water System Failures at Multi-Unit Sites" + (01:02:22, 19 February 2020)
- NRC Generic Letter 91-12, Operator Licensing National Examination Schedule + (01:03:05, 19 February 2020)
- NRC Generic Letter 91-11, Resolution of Generic Issues 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers," Pursuant to 10 CFR 50.54 + (01:03:13, 19 February 2020)
- NRC Generic Letter 91-10, Explosives Searches at Protected Area Portals + (01:03:29, 19 February 2020)
- NRC Generic Letter 91-09, Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System + (01:03:37, 19 February 2020)
- NRC Generic Letter 91-08, Removal of Component Lists from Technical Specifications + (01:03:45, 19 February 2020)
- NRC Generic Letter 91-07, GI-23, "Reactor Coolant Pump Seal Failures" and Its Possible Effect on Station Blackout + (01:03:54, 19 February 2020)
- NRC Generic Letter 91-06, Resolution of Generic Issue A-30, "Adequacy of Safety-Related DC Power Supplies," Pursuant to 10 CFR 50.54(f) + (01:04:02, 19 February 2020)
- NRC Generic Letter 91-05, Licensee Commercial-Grade Procurement and Dedication Programs + (01:04:09, 19 February 2020)
- NRC Generic Letter 91-04, Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle + (01:04:19, 19 February 2020)
- NRC Generic Letter 91-03, Reporting of Safeguards Events + (01:04:25, 19 February 2020)
- NRC Generic Letter 91-02, Reporting Mishaps Involving LLW Forms Prepared for Disposal + (01:05:10, 19 February 2020)
- NRC Generic Letter 91-01, Removal of the Schedule for the Withdrawal of Reactor Vessel Material Specimens from Technical Specifications + (01:05:18, 19 February 2020)
- NRC Generic Letter 92-09, Limited Participation by NRC in the IAEA International Nuclear Event Scale + (01:05:24, 19 February 2020)
- NRC Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers + (01:05:32, 19 February 2020)
- NRC Generic Letter 92-07, Office of Nuclear Reactor Regulation Reorganization + (01:05:39, 19 February 2020)
- NRC Generic Letter 92-06, Operator Licensing National Examination Schedule + (01:05:49, 19 February 2020)
- NRC Generic Letter 92-05, NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program + (01:06:00, 19 February 2020)
- NRC Generic Letter 92-04, Resolution of the Issues Related to Reactor Vessel Water Level Instrumention in BWRs Pursuant to 10 CFR 50.54(f) + (01:06:35, 19 February 2020)
- NRC Generic Letter 92-03, Compilation of the Current Licensing Basis: Request for Voluntary Participation in Pilot Program + (01:06:46, 19 February 2020)
- NRC Generic Letter 92-02, Resolution of Generic Issue 79, "Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown" + (01:06:56, 19 February 2020)
- NRC Generic Letter 92-01, Reactor Vessel Structural Integrity + (01:08:10, 19 February 2020)
- NRC Generic Letter 93-08, Relocation of Technical Specification Tables of Instrument Response Time Limits + (01:09:26, 19 February 2020)
- NRC Generic Letter 93-07, Modification of the Technical Specification Administrative Control Requirements for Emergency and Security Plans + (01:10:09, 19 February 2020)
- NRC Generic Letter 93-06, Research Results on Generic Safety Issue 106, "Piping and the Use of Highly Combustible Gases in Vital Areas" + (01:10:19, 19 February 2020)
- NRC Generic Letter 93-05, Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operation + (01:10:27, 19 February 2020)
- NRC Generic Letter 93-04, Rod Control System Failure and Withdrawal of Rod Control Cluster Assemblies, 10 CFR 50.54(f) + (01:11:13, 19 February 2020)
- NRC Generic Letter 93-03, Verification of Plant Records + (01:11:21, 19 February 2020)
- NRC Generic Letter 93-02, NRC Public Workshop on Commercial Grade Procurement and Dedication + (01:12:05, 19 February 2020)
- NRC Generic Letter 93-01, Emergency Response Data System Test Program + (01:12:15, 19 February 2020)
- NRC Generic Letter 94-04, Voluntary Reporting of Additional Occupational Radiation Exposure Data + (01:12:29, 19 February 2020)
- NRC Generic Letter 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors + (01:13:13, 19 February 2020)
- NRC Generic Letter 94-02, Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in BWRs + (01:13:22, 19 February 2020)
- NRC Generic Letter 94-01, Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators + (01:13:31, 19 February 2020)
- NRC Generic Letter 95-10, Relocation of Selected Technical Specifications Requirements Related to Instrumentation + (01:14:16, 19 February 2020)
- NRC Generic Letter 95-09, Monitoring and Training of Shippers and Carriers of Radioactive Materials + (01:14:24, 19 February 2020)
- NRC Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval + (01:15:10, 19 February 2020)
- NRC Generic Letter 95-07, Pressure Locking and Thermal Binding of Safety- Related Power-Operated Gate Valves + (01:16:23, 19 February 2020)
- NRC Generic Letter 95-06, Changes in the Operator Licensing Program + (01:16:33, 19 February 2020)
- NRC Generic Letter 95-05, Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking + (01:17:47, 19 February 2020)
- NRC Generic Letter 95-04, Final Disposition of the Systematic Evaluation Program Lessons-Learned Issues + (01:17:57, 19 February 2020)
- NRC Generic Letter 95-03, Circumferential Cracking of Steam Generator Tubes + (01:18:43, 19 February 2020)
- NRC Generic Letter 95-02, Use of Numarc/epri Report TR-102348, "Guideline on Licensing Digital Upgrades," in Determining the Acceptability of Performing Analog-to-Digital Replacements under 10 CFR 50.59 + (01:18:51, 19 February 2020)
- NRC Generic Letter 95-01, NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities + (01:19:00, 19 February 2020)
- NRC Generic Letter 96-07, Interim Guidance on Transportation of Steam Generators + (01:20:14, 19 February 2020)
- NRC Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions + (01:20:23, 19 February 2020)
- NRC Generic Letter 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (01:20:43, 19 February 2020)
- NRC Generic Letter 96-03, Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits + (01:20:51, 19 February 2020)