Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 89-12, Operator Licensing Examination + (00:51:44, 19 February 2020)
- NRC Generic Letter 89-11, Resolution of Generic Issue 101 "Boiling Water Reactor Water Level Redundancy" + (00:52:57, 19 February 2020)
- NRC Generic Letter 89-09, ASME Section III Component Replacements + (00:53:04, 19 February 2020)
- NRC Generic Letter 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning + (00:53:12, 19 February 2020)
- NRC Generic Letter 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs + (00:53:20, 19 February 2020)
- NRC Generic Letter 89-06, Task Action Item I.D.2 - Safety Parameter Display System - 10 CFR 50.54 (f) + (00:53:33, 19 February 2020)
- NRC Generic Letter 89-05, Pilot Testing of the Fundamentals Examination + (00:53:40, 19 February 2020)
- NRC Generic Letter 89-04, Guidance on Developing Acceptable Inservice Testing Programs + (00:54:27, 19 February 2020)
- NRC Generic Letter 89-03, Operator Licensing Examination Schedule + (00:54:41, 19 February 2020)
- NRC Generic Letter 89-02, Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products + (00:54:48, 19 February 2020)
- NRC Generic Letter 89-01, Implementation of Programmatic and Procedural Controls for Radiological Effluent Technical Specifications + (00:54:58, 19 February 2020)
- NRC Generic Letter 90-09, Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions + (00:55:55, 19 February 2020)
- NRC Generic Letter 90-08, Simulation Facility Exemptions + (00:56:33, 19 February 2020)
- NRC Generic Letter 90-07, Operator Licensing National Examination Schedule + (00:57:47, 19 February 2020)
- NRC Generic Letter 90-06, Resolution of Generic Issues 70, "PORV and Block Valve Reliability," and 94, "Additional Ltop Protection for PWRs" + (00:57:54, 19 February 2020)
- NRC Generic Letter 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping + (00:58:03, 19 February 2020)
- NRC Generic Letter 90-04, Request for Information on the Status of Licensee Implementation of GSIs Resolved with Imposition of Requirements or CAs + (00:58:15, 19 February 2020)
- NRC Generic Letter 90-03, Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2, "Vendor Interface for Safety-Related Components" + (00:58:59, 19 February 2020)
- NRC Generic Letter 90-02, Alternative Requirements for Fuel Assemblies in the Design Features Section of Technical Specifications + (01:00:13, 19 February 2020)
- NRC Generic Letter 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey + (01:00:21, 19 February 2020)
- NRC Generic Letter 91-19, Information to Addressees Regarding New Telephone Numbers for NRC Offices Located in One White Flint North + (01:00:28, 19 February 2020)
- NRC Generic Letter 91-17, Generic Safety Issue 29, "Bolting Degradation or Failure in Nuclear Power Plants" + (01:01:47, 19 February 2020)
- NRC Generic Letter 91-16, Licensed Operators' and Other Nuclear Facility Personnel Fitness for Duty + (01:01:58, 19 February 2020)
- NRC Generic Letter 91-15, Operating Experience Feedback Report, Solenoid-Operated Valve Problems at U.S. Reactors + (01:02:06, 19 February 2020)
- NRC Generic Letter 91-14, Emergency Telecommunications + (01:02:14, 19 February 2020)
- NRC Generic Letter 91-13, Request for Info Related to the Resolution of GI 130, "Essential Service Water System Failures at Multi-Unit Sites" + (01:02:22, 19 February 2020)
- NRC Generic Letter 91-12, Operator Licensing National Examination Schedule + (01:03:05, 19 February 2020)
- NRC Generic Letter 91-11, Resolution of Generic Issues 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers," Pursuant to 10 CFR 50.54 + (01:03:13, 19 February 2020)
- NRC Generic Letter 91-10, Explosives Searches at Protected Area Portals + (01:03:29, 19 February 2020)
- NRC Generic Letter 91-09, Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System + (01:03:37, 19 February 2020)
- NRC Generic Letter 91-08, Removal of Component Lists from Technical Specifications + (01:03:45, 19 February 2020)
- NRC Generic Letter 91-07, GI-23, "Reactor Coolant Pump Seal Failures" and Its Possible Effect on Station Blackout + (01:03:54, 19 February 2020)
- NRC Generic Letter 91-06, Resolution of Generic Issue A-30, "Adequacy of Safety-Related DC Power Supplies," Pursuant to 10 CFR 50.54(f) + (01:04:02, 19 February 2020)
- NRC Generic Letter 91-05, Licensee Commercial-Grade Procurement and Dedication Programs + (01:04:09, 19 February 2020)
- NRC Generic Letter 91-04, Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle + (01:04:19, 19 February 2020)
- NRC Generic Letter 91-03, Reporting of Safeguards Events + (01:04:25, 19 February 2020)
- NRC Generic Letter 91-02, Reporting Mishaps Involving LLW Forms Prepared for Disposal + (01:05:10, 19 February 2020)
- NRC Generic Letter 91-01, Removal of the Schedule for the Withdrawal of Reactor Vessel Material Specimens from Technical Specifications + (01:05:18, 19 February 2020)
- NRC Generic Letter 92-09, Limited Participation by NRC in the IAEA International Nuclear Event Scale + (01:05:24, 19 February 2020)
- NRC Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers + (01:05:32, 19 February 2020)
- NRC Generic Letter 92-07, Office of Nuclear Reactor Regulation Reorganization + (01:05:39, 19 February 2020)
- NRC Generic Letter 92-06, Operator Licensing National Examination Schedule + (01:05:49, 19 February 2020)
- NRC Generic Letter 92-05, NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program + (01:06:00, 19 February 2020)
- NRC Generic Letter 92-04, Resolution of the Issues Related to Reactor Vessel Water Level Instrumention in BWRs Pursuant to 10 CFR 50.54(f) + (01:06:35, 19 February 2020)
- NRC Generic Letter 92-03, Compilation of the Current Licensing Basis: Request for Voluntary Participation in Pilot Program + (01:06:46, 19 February 2020)
- NRC Generic Letter 92-02, Resolution of Generic Issue 79, "Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown" + (01:06:56, 19 February 2020)
- NRC Generic Letter 92-01, Reactor Vessel Structural Integrity + (01:08:10, 19 February 2020)
- NRC Generic Letter 93-08, Relocation of Technical Specification Tables of Instrument Response Time Limits + (01:09:26, 19 February 2020)
- NRC Generic Letter 93-07, Modification of the Technical Specification Administrative Control Requirements for Emergency and Security Plans + (01:10:09, 19 February 2020)
- NRC Generic Letter 93-06, Research Results on Generic Safety Issue 106, "Piping and the Use of Highly Combustible Gases in Vital Areas" + (01:10:19, 19 February 2020)
- NRC Generic Letter 93-05, Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operation + (01:10:27, 19 February 2020)