Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 87-05, Request for Additional Information Assessment of Licensee Measures to Mitigate and/or Identify Potential Degradation of Mark I Drywells + (00:40:16, 19 February 2020)
- NRC Generic Letter 87-04, Temporary Exemption From Provisions of the FBI Criminal History Rule for Temporary Workers + (00:40:23, 19 February 2020)
- NRC Generic Letter 87-03, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (USI A-46) + (00:40:30, 19 February 2020)
- NRC Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (USI A-46) + (00:41:25, 19 February 2020)
- NRC Generic Letter 87-01, Public Availability of the NRC Operator Licensing Examination Question Bank + (00:41:34, 19 February 2020)
- NRC Generic Letter 88-19, Use of Deadly Force by Licensee Guards to Prevent Theft of Special Nuclear Material + (00:41:44, 19 February 2020)
- NRC Generic Letter 88-18, Plant Record Storage on Optical Disks + (00:41:50, 19 February 2020)
- NRC Generic Letter 88-17, Loss of Decay Heat Removal + (00:42:35, 19 February 2020)
- NRC Generic Letter 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications + (00:42:51, 19 February 2020)
- NRC Generic Letter 88-15, Electric Power Systems - Inadequate Control Over Design Process + (00:43:01, 19 February 2020)
- NRC Generic Letter 88-14, Instrument Air Supply System Problems Affecting Safety-Related Equipment + (00:43:07, 19 February 2020)
- NRC Generic Letter 88-13, Operator Licensing Examinations + (00:43:14, 19 February 2020)
- NRC Generic Letter 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Materials and Its Impact on Plant Operations + (00:44:47, 19 February 2020)
- NRC Generic Letter 88-10, Purchase of GSA Approved Security Containers + (00:44:54, 19 February 2020)
- NRC Generic Letter 88-09, Pilot Testing of Fundamentals Examination + (00:45:14, 19 February 2020)
- NRC Generic Letter 88-08, Mail Sent or Delivered to the Office of Nuclear Reactor Regulation + (00:45:38, 19 February 2020)
- NRC Generic Letter 88-07, Modified Enforcement Policy Relating to 10 CFR 50.49, "Environmental Qualification of Electrical Equipment Important to Safety" + (00:45:48, 19 February 2020)
- NRC Generic Letter 88-06, Removal of Organization Charts from Technical Specification Administrative Control Requirements + (00:46:00, 19 February 2020)
- NRC Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR plants + (00:46:07, 19 February 2020)
- NRC Generic Letter 88-04, Distribution of Gems Irradiated in Research Reactors + (00:46:15, 19 February 2020)
- NRC Generic Letter 88-03, Resolution of Generic Safety Issue 93, "Steam Binding of Auxiliary Feedwater Pumps" + (00:46:23, 19 February 2020)
- NRC Generic Letter 88-02, Integrated Safety Assessment Program II (ISAP II) + (00:46:31, 19 February 2020)
- NRC Generic Letter 88-01, NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping + (00:46:48, 19 February 2020)
- NRC Generic Letter 89-23, NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 + (00:47:32, 19 February 2020)
- NRC Generic Letter 89-22, Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service + (00:48:44, 19 February 2020)
- NRC Generic Letter 89-21, Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements + (00:48:51, 19 February 2020)
- NRC Generic Letter 89-20, Protected Area Long-Term Housekeeping + (00:49:00, 19 February 2020)
- NRC Generic Letter 89-19, Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" Pursuant to 10 CFR 50.54(f) + (00:49:09, 19 February 2020)
- NRC Generic Letter 89-18, Resolution of Unresolved Safety Issues A-17, "Systems Interactions in Nuclear Power Plants" + (00:49:17, 19 February 2020)
- NRC Generic Letter 89-17, Planned Administrative Changes to the NRC Operator Licensing Written Examination Process + (00:49:31, 19 February 2020)
- NRC Generic Letter 89-16, Installation of a Hardened Wetwell Vent + (00:49:38, 19 February 2020)
- NRC Generic Letter 89-15, Emergency Response Data System + (00:49:47, 19 February 2020)
- NRC Generic Letter 89-14, Line-Item Improvements in Technical Specifications - Removal of 3.25 Limit on Extending Surveillance Intervals + (00:50:35, 19 February 2020)
- NRC Generic Letter 89-13, Service Water System Problems Affecting Safety-Related Equipment + (00:50:43, 19 February 2020)
- NRC Generic Letter 89-12, Operator Licensing Examination + (00:51:44, 19 February 2020)
- NRC Generic Letter 89-11, Resolution of Generic Issue 101 "Boiling Water Reactor Water Level Redundancy" + (00:52:57, 19 February 2020)
- NRC Generic Letter 89-09, ASME Section III Component Replacements + (00:53:04, 19 February 2020)
- NRC Generic Letter 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning + (00:53:12, 19 February 2020)
- NRC Generic Letter 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs + (00:53:20, 19 February 2020)
- NRC Generic Letter 89-06, Task Action Item I.D.2 - Safety Parameter Display System - 10 CFR 50.54 (f) + (00:53:33, 19 February 2020)
- NRC Generic Letter 89-05, Pilot Testing of the Fundamentals Examination + (00:53:40, 19 February 2020)
- NRC Generic Letter 89-04, Guidance on Developing Acceptable Inservice Testing Programs + (00:54:27, 19 February 2020)
- NRC Generic Letter 89-03, Operator Licensing Examination Schedule + (00:54:41, 19 February 2020)
- NRC Generic Letter 89-02, Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products + (00:54:48, 19 February 2020)
- NRC Generic Letter 89-01, Implementation of Programmatic and Procedural Controls for Radiological Effluent Technical Specifications + (00:54:58, 19 February 2020)
- NRC Generic Letter 90-09, Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions + (00:55:55, 19 February 2020)
- NRC Generic Letter 90-08, Simulation Facility Exemptions + (00:56:33, 19 February 2020)
- NRC Generic Letter 90-07, Operator Licensing National Examination Schedule + (00:57:47, 19 February 2020)
- NRC Generic Letter 90-06, Resolution of Generic Issues 70, "PORV and Block Valve Reliability," and 94, "Additional Ltop Protection for PWRs" + (00:57:54, 19 February 2020)
- NRC Generic Letter 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping + (00:58:03, 19 February 2020)
- NRC Generic Letter 90-04, Request for Information on the Status of Licensee Implementation of GSIs Resolved with Imposition of Requirements or CAs + (00:58:15, 19 February 2020)