Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 86-11, Distribution of Products Irradiated in Research Reactors + (00:31:59, 19 February 2020)
- NRC Generic Letter 86-10, Implementation of Fire Protection Requirements + (00:32:05, 19 February 2020)
- NRC Generic Letter 86-09, Technical Resolution of Generic Issue B-59, (N-1) Loop Operation in BWRs and PWRs + (00:32:18, 19 February 2020)
- NRC Generic Letter 86-08, Availability of Supplement 4 to NUREG-0933, "A Prioritization of Generic Safety Issues" + (00:33:02, 19 February 2020)
- NRC Generic Letter 86-07, Transmittal of NUREG-1190 Regarding the San Onofre Unit 1 Loss of Power and Water Hammer Event + (00:34:16, 19 February 2020)
- NRC Generic Letter 86-06, Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" + (00:34:24, 19 February 2020)
- NRC Generic Letter 86-05, Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" + (00:35:10, 19 February 2020)
- NRC Generic Letter 86-04, Policy Statement On Engineering Expertise on Shift + (00:35:17, 19 February 2020)
- NRC Generic Letter 86-03, Applications for License Amendments + (00:35:24, 19 February 2020)
- NRC Generic Letter 86-02, Technical Resolution of Generic Issue B-19 - Thermal Hydraulic Stability + (00:35:33, 19 February 2020)
- NRC Generic Letter 86-01, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (00:36:17, 19 February 2020)
- NRC Generic Letter 87-16, Transmittal of NUREG-1262, "Answers to Questions on Implementation of 10 CFR 55 on Operators' Licenses" + (00:37:02, 19 February 2020)
- NRC Generic Letter 87-15, Policy Statement on Deferred Plants + (00:37:11, 19 February 2020)
- NRC Generic Letter 87-14, Operator Licensing Examinations + (00:37:19, 19 February 2020)
- NRC Generic Letter 87-13, Integrity of Requalification Examinations at Non-Power Reactors + (00:37:26, 19 February 2020)
- NRC Generic Letter 87-12, Loss of Residual Heat Removal While the Reactor Coolant System is Partially Filled + (00:38:10, 19 February 2020)
- NRC Generic Letter 87-11, Relaxation in Arbitrary Intermediate Pipe Rupture Requirements + (00:38:18, 19 February 2020)
- NRC Generic Letter 87-10, Implementation of 10 CFR 73.57, Requirements for FBI Criminal History Checks + (00:38:25, 19 February 2020)
- NRC Generic Letter 87-09, Sections 3.0 and 4.0 of Standard Tech Specs on Limiting Conditions for Operation and Surveillance Requirements + (00:38:31, 19 February 2020)
- NRC Generic Letter 87-08, Implementation of 10 CFR 73.55 Miscellaneous Amendments and Search Requirements + (00:39:15, 19 February 2020)
- NRC Generic Letter 87-07, Information Transmittal of Final Rulemaking for Revisions to Operator Licensing - 10 CFR 55 and Confirming Amendments + (00:39:23, 19 February 2020)
- NRC Generic Letter 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves + (00:39:32, 19 February 2020)
- NRC Generic Letter 87-05, Request for Additional Information Assessment of Licensee Measures to Mitigate and/or Identify Potential Degradation of Mark I Drywells + (00:40:16, 19 February 2020)
- NRC Generic Letter 87-04, Temporary Exemption From Provisions of the FBI Criminal History Rule for Temporary Workers + (00:40:23, 19 February 2020)
- NRC Generic Letter 87-03, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (USI A-46) + (00:40:30, 19 February 2020)
- NRC Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (USI A-46) + (00:41:25, 19 February 2020)
- NRC Generic Letter 87-01, Public Availability of the NRC Operator Licensing Examination Question Bank + (00:41:34, 19 February 2020)
- NRC Generic Letter 88-19, Use of Deadly Force by Licensee Guards to Prevent Theft of Special Nuclear Material + (00:41:44, 19 February 2020)
- NRC Generic Letter 88-18, Plant Record Storage on Optical Disks + (00:41:50, 19 February 2020)
- NRC Generic Letter 88-17, Loss of Decay Heat Removal + (00:42:35, 19 February 2020)
- NRC Generic Letter 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications + (00:42:51, 19 February 2020)
- NRC Generic Letter 88-15, Electric Power Systems - Inadequate Control Over Design Process + (00:43:01, 19 February 2020)
- NRC Generic Letter 88-14, Instrument Air Supply System Problems Affecting Safety-Related Equipment + (00:43:07, 19 February 2020)
- NRC Generic Letter 88-13, Operator Licensing Examinations + (00:43:14, 19 February 2020)
- NRC Generic Letter 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Materials and Its Impact on Plant Operations + (00:44:47, 19 February 2020)
- NRC Generic Letter 88-10, Purchase of GSA Approved Security Containers + (00:44:54, 19 February 2020)
- NRC Generic Letter 88-09, Pilot Testing of Fundamentals Examination + (00:45:14, 19 February 2020)
- NRC Generic Letter 88-08, Mail Sent or Delivered to the Office of Nuclear Reactor Regulation + (00:45:38, 19 February 2020)
- NRC Generic Letter 88-07, Modified Enforcement Policy Relating to 10 CFR 50.49, "Environmental Qualification of Electrical Equipment Important to Safety" + (00:45:48, 19 February 2020)
- NRC Generic Letter 88-06, Removal of Organization Charts from Technical Specification Administrative Control Requirements + (00:46:00, 19 February 2020)
- NRC Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR plants + (00:46:07, 19 February 2020)
- NRC Generic Letter 88-04, Distribution of Gems Irradiated in Research Reactors + (00:46:15, 19 February 2020)
- NRC Generic Letter 88-03, Resolution of Generic Safety Issue 93, "Steam Binding of Auxiliary Feedwater Pumps" + (00:46:23, 19 February 2020)
- NRC Generic Letter 88-02, Integrated Safety Assessment Program II (ISAP II) + (00:46:31, 19 February 2020)
- NRC Generic Letter 88-01, NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping + (00:46:48, 19 February 2020)
- NRC Generic Letter 89-23, NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 + (00:47:32, 19 February 2020)
- NRC Generic Letter 89-22, Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service + (00:48:44, 19 February 2020)
- NRC Generic Letter 89-21, Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements + (00:48:51, 19 February 2020)
- NRC Generic Letter 89-20, Protected Area Long-Term Housekeeping + (00:49:00, 19 February 2020)
- NRC Generic Letter 89-19, Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" Pursuant to 10 CFR 50.54(f) + (00:49:09, 19 February 2020)
- NRC Generic Letter 89-18, Resolution of Unresolved Safety Issues A-17, "Systems Interactions in Nuclear Power Plants" + (00:49:17, 19 February 2020)