Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2019-LRM-0087 + (07:15:13, 18 September 2025)
- 05000313/LER-1980-028-01, Intake Structure Concrete Access Plugs Removed.Later Review Identified Access Barriers to Be Missile Shields & No Protection Provided at Personnel Access Doors.Plugs Replaced + (07:15:19, 18 September 2025)
- 05000313/LER-1980-028, Forwards Revised LER 80-028/01X-1 + (07:15:30, 18 September 2025)
- 05000346/LER-1980-025-03, /03X-1:on 800330,control Rod Group 5,rod 11 Absolute Position Indication Declared Inoperable.Caused by Fluctuating Signals Resulting in Numerous Asymmetric Rod Alarms Due to Defective Reed Switch Assemblies + (07:15:36, 18 September 2025)
- 05000346/LER-1980-025, Forwards LER 80-025/03X-1 + (07:15:38, 18 September 2025)
- 05000260/LER-1981-010-03, /03L-0:on 810306,during Normal Operation,Special Instruction 4.1.B.2 Was Not Performed.Caused by Personnel Error.Personnel Cautioned to Perform Instructions as Scheduled + (07:15:41, 18 September 2025)
- 05000260/LER-1981-010, Forwards LER 81-010/03L-0 + (07:15:43, 18 September 2025)
- 05000338/LER-1981-007-99, Plug Found Missing from Tube at Row 1,column 12.On 810202,two More Plugs Found Missing.Caused by Bad Seals.One Tube Was Replugged on 810124.Other Two Tubes Replugged on 810303 + (07:15:59, 18 September 2025)
- 05000338/LER-1981-007, Forwards Updated LER 81-007/99X-1 + (07:16:01, 18 September 2025)
- 05000338/LER-1980-087-03, During Repairs to Steam Driven Auxiliary Feedwater Pump 1-FW-P-2,turbine Trip Valve Tripped Upon Pump Startup.Cause Unstated.Valve Governor Reset & Retested Satisfactorily + (07:16:03, 18 September 2025)
- 05000338/LER-1980-087, Forwards Updated LER 80-087/03X-1 + (07:16:05, 18 September 2025)
- TAC:12162 + (07:16:07, 18 September 2025)
- ML19350B860 + (07:16:08, 18 September 2025)
- ML19350B856 + (07:16:09, 18 September 2025)
- 05000366/LER-1981-015-03, /03L-0:on 810304,intermediate Range Monitor H (2C51-K601H) Would Not Come on Scale for Overlap Check Between Intermediate & Source Range Monitors During Scram Recovery Procedure HNP-2-1010.Caused by Pushed Back Pins + (07:16:11, 18 September 2025)
- 05000366/LER-1981-015, Forwards LER 81-015/03L-0 + (07:16:19, 18 September 2025)
- 05000366/LER-1980-151-03, Primary Feedwater Isolation Valve 2B21-F010B Leakage Rate Found to Exceed Bypass Path Penetration Tech Spec.Caused by Scratches on Seat of Valve Due to Valve Closing on Debris + (07:16:20, 18 September 2025)
- 05000366/LER-1980-149-03, RHR Pump Suction Isolation Valve 2E11-F4B Was Found Leaking.Caused by Scratches on Valve Seat,Probably Due to Valve Closing on Debris.Valve Seat Polished + (07:16:23, 18 September 2025)
- 05000366/LER-1980-139-01, Ae Advised That Drywell Equipment Drain Sump Discharge to Radwaste Piping Not Seismic Beyond Inboard Isolation Valve.Caused by Installation Error on Anchor 2G11-RAD-A90.Restraint Added + (07:16:25, 18 September 2025)
- 05000366/LER-1980-149, Forwards Updated LER 80-149/03X-1 + (07:16:27, 18 September 2025)
- 05000366/LER-1980-139, Forwards Updated LER 80-139/01X-1 + (07:16:28, 18 September 2025)
- A01379, Advises of Actions Taken to Reduce Power Operated Relief Valve Sys Failures Per NUREG-0737.Turbine Runback Feature Has Been Eliminated.Actions Have Reduced Probability of Small Break Loca.No Further Action Planned + (07:16:31, 18 September 2025)
- TAC:42092 + (07:16:36, 18 September 2025)
- 05000306/LER-1981-002, Forwards LER 81-002/01T-0 + (07:16:43, 18 September 2025)
- TAC:43492 + (07:16:47, 18 September 2025)
- A01413, Requests Addl Time to Prepare License Amend Application Requested 801121 Re Tech Spec Revisions for Snubber Surveillance.Replacement Program Will Require Shutdown Scheduled by 810501.Tech Specs to Be Proposed by 810701 + (07:16:51, 18 September 2025)
- EPID:L-2019-LLA-0081 + (07:17:02, 18 September 2025)
- 05000219/LER-1981-008-03, /03L-0:on 810210,water Seepage Observed Along West Wall of Nrw Bldg.Direct Survey Showed Detectable Ground Contamination Only within 6 Inches of Wall.Caused by High Levels in Tank Vaults.Herculite Secured & Sealed to Wall + (07:17:11, 18 September 2025)
- 05000219/LER-1981-008, Forwards LER 81-008/03L-0 + (07:17:14, 18 September 2025)
- 05000346/LER-1979-062-03, /03L-1:on 790521,auxiliary Feedwater Suction Pressure Switches PSL107C,PSL4928B & PSL4930A Found Inoperable & Pressure Setpoints of PSL4929,PSL4929B & PSL4931A Found Outside Limits.Caused by Instrument Drift + (07:17:22, 18 September 2025)
- 05000346/LER-1979-062, Forwards LER 79-062/03L-1 + (07:17:29, 18 September 2025)
- TAC:63083 + (07:17:32, 18 September 2025)
- 05000302/LER-1980-058-03, /03L-0:on 800806,decay Heat Pump a Discharge Throttle Valve Would Not Control Flow in Automatic.Caused by Air in Controller Sensing Line.Sensing Line Vented + (07:17:33, 18 September 2025)
- ML19350A576 + (07:17:44, 18 September 2025)
- A800005, Requests Revision of License DPR-46 to Allow Operation Following Sixth Refueling.Forwards Supplemental Reload Licensing Submittal for Cooper Nuclear Station 1,Reload 6, Jan 1981, & Proposed Tech Specs Changes + (07:17:47, 18 September 2025)
- TAC:43380 + (07:17:49, 18 September 2025)
- A01155, Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790) + (07:17:52, 18 September 2025)
- 05000388/LER-2017-010-01, Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Switches + (07:18:01, 18 September 2025)
- A810005, Forwards Revision 10 to Physical Security Plan.Revision Withheld (Ref 10CFR2.790) + (07:18:03, 18 September 2025)
- ML19350A034 + (07:18:11, 18 September 2025)
- ENS 57931 + (02:59:59, 24 September 2025)
- ENS 57923 + (03:00:04, 24 September 2025)
- ENS 57924 + (03:00:05, 24 September 2025)
- ENS 57927 + (03:00:07, 24 September 2025)
- ENS 57918 + (03:03:13, 24 September 2025)
- ENS 57930 + (03:03:20, 24 September 2025)
- ENS 57896 + (03:03:22, 24 September 2025)
- ENS 57909 + (03:03:23, 24 September 2025)
- ENS 57818 + (03:03:25, 24 September 2025)
- ENS 57912 + (03:03:25, 24 September 2025)
- ENS 57928 + (03:03:26, 24 September 2025)