- ULNRC-06038, Callaway, Unit 1, 10 CFR 50.59 Summary Report + (00:10:12, 14 July 2018)
- NL-13-143, Indian Point, Unit 3 - Response to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During the Spring 2013 Refueling Outage + (01:18:35, 14 July 2018)
- DCL-11-104, Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related. + (01:19:11, 14 July 2018)
- DCL-11-104, Attachment 13: Inter-Departmental Administrative Procedure CF2.ID9, Rev. 2, Software Quality Assurance for Software Development. + (01:19:23, 14 July 2018)
- DCL-11-104, Attachment 12: Revision 10 to CF2.ID2, Software Configuration Management for Plant Operations and Operations Support. + (01:19:28, 14 July 2018)
- DCL-11-104, Attachment 11: Revision 8 to Procedure CF2, Computer Hardware, Software and Database Control. + (01:19:34, 14 July 2018)
- DCL-11-104, Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines. + (01:19:40, 14 July 2018)
- ULNRC-06051, Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 + (01:31:46, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Appendix a + (02:06:47, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14 - Figure 14.3-1 Though Figure 14.3-129 + (02:06:52, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14 - Figure 14.2-0 Through Figure 14.2-18 + (02:06:56, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14 - Figure 14.0-1 Through Figure 14.1-67 + (02:07:00, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 13, Tests and Operations + (02:08:18, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 12, Conduct of Operations + (02:08:22, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 11 - Figure 11.1-1 + (02:08:27, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 11 - Figure 11B-1 Through Figure 11B-5 + (02:08:31, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 11, Waste Disposal and Radiation Protection System + (02:08:37, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Table of Contents + (02:08:41, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 10 - Figures 10.1-1a Through 10.2-9 + (02:08:45, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 10 - Steam and Power Conversion System + (02:08:49, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 9 - Figures 9.2-1 Through 9.9-1 + (02:08:58, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 9 - Figures 9.5-1 Through 9.5-5 + (02:09:03, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 9 - Auxiliary and Emergency Systems + (02:09:12, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 8 - Figures 8.2-1 Through 8.2-17 + (02:09:20, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 8 - Figure 8.2-4 + (02:09:23, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 8 - Electrical Systems + (02:09:28, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 10 - Figure 10.2-1 Through Figure 10.2-7 + (02:09:49, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 7 - Figure 7.2-34 Through Figure 7.2-32 + (02:09:54, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 7 - Figure 7.1-1 Through Figure 7.6-3 + (02:09:58, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 7 - Instrumentation and Control + (02:10:07, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 6 - Engineered Safety Features + (02:10:19, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 5 - Figure 5.3-1 + (02:10:24, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 5 - Figure 5.3-1 Through Figure 5.2-29 + (02:10:30, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 5 - Containment Systems + (02:10:40, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 4 - Figure 4.2-12 Through Figure 4.2-1 + (02:10:46, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 4 - Figure 4C-3 Through Figure 4C-2 + (02:10:55, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 4 - Reactor Coolant System + (02:11:03, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 3 - Figure 3.2-61C Through Figure 3.2-70 + (02:11:09, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 2 - Figure 2.2-3 Through Figure 2.6-3 + (02:11:22, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 2 - Site and Environment + (02:11:37, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 1 - Figure 1.2-4 Through Figure 1.11-8 + (02:11:43, 14 July 2018)
- NL-13-130, Indian Point, Unit 2 - Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 1 - Introduction and Summary + (02:11:50, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 6 - Figure 6.4-3 Through Figure 6.4-4 + (02:11:57, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 6 - Figure 6C-6, Through Figure 6D-2 + (02:12:03, 14 July 2018)
- ULNRC-06048, Callaway, Unit 1, 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed Valves + (02:12:43, 14 July 2018)
- RS-13-151, LaSalle County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H + (03:15:54, 14 July 2018)
- RS-13-151, LaSalle County Station, Units 1 & 2, Response to Request for Additional Information Re License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink (Uhs). + (03:15:59, 14 July 2018)
- DCL-13-092, Diablo Canyon Power Plant Units 1 & 2, Submittal of Technical Specification Bases, Revision 8 + (03:21:51, 14 July 2018)
- DCL-13-016, Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System. + (04:07:59, 14 July 2018)
- DCL-13-016, Attachment 3 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3596 + (04:08:03, 14 July 2018)
- DCL-13-016, Attachment 2 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3599 + (04:08:07, 14 July 2018)