Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 83 of 111 Through Figure 3.6-1. Sheet 94 of 111 + (22:06:08, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 70 of 111 Through Figure 3.6-1. Sheet 82 of 111 + (22:06:13, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Licensing Basis Documents + (22:06:16, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 43 of 111 Through Figure 3.6-1. Sheet 49 of 111 + (22:06:20, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics, Figure 2.4-19 Through Figure 2.4-53 + (22:07:37, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics, Figure 2.1-1 Through Figure 2.4-18 + (22:08:07, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics + (22:08:22, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 1 - Introduction and General Description of Plant + (22:08:30, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, List of Effected Pages + (22:08:42, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 1 of 111 Through Figure 3.6-1. Sheet 42 of 111 + (22:10:32, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems + (22:11:06, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 2 - Site Characteristics, Figure A2.5-1 Through Figure C2.5-23 + (22:11:13, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 2, Figure 2.5-300. Sheet 1 of 2 Through Figure 2.5-496 + (22:11:24, 13 July 2018)
- NL-13-156, 51-9195289-000, Flood Hazard Reevaluation Report Required by 10 CFR 50.54 (F) Near-Term Task Force Recommendation 2.1. Page 3-58 Through Page 3-105, Enclosure to NL-13-156 + (23:00:49, 13 July 2018)
- NL-13-156, 51-9195289-000, Flood Hazard Reevaluation Report Required by 10 CFR 50.54 (F) Near-Term Task Force Recommendation 2.1. Cover Through Page 3-57, Enclosure to NL-13-156 + (23:00:57, 13 July 2018)
- NL-13-156, Indian Point, Units 2 and 3 - Required Response for NTTF Recommendation 2.1: Flooding - Hazard Reevaluation Report + (23:01:01, 13 July 2018)
- RS-13-266, LaSalle County Station, Unit 1, License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature Curves + (23:09:09, 13 July 2018)
- NL-13-148, Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484) + (23:10:34, 13 July 2018)
- ULNRC-06060, Callaway, Unit 1, Response to RAI Set 5 Regarding Adoption of National Fire Protection Association Standard NFPA 805 + (23:12:59, 13 July 2018)
- NL-13-2521, Edwin I. Hatch, Units 1 and 2, ISI Program Alternative HNP-ISI-ALT-18, Version 1 + (23:27:04, 13 July 2018)
- ULNRC-06038, Callaway, Unit 1, 10 CFR 50.59 Summary Report + (00:10:12, 14 July 2018)
- NL-13-143, Indian Point, Unit 3 - Response to Request for Additional Information Regarding Steam Generator Tube Inservice Inspection Performed During the Spring 2013 Refueling Outage + (01:18:35, 14 July 2018)
- DCL-11-104, Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related. + (01:19:11, 14 July 2018)
- DCL-11-104, Attachment 13: Inter-Departmental Administrative Procedure CF2.ID9, Rev. 2, Software Quality Assurance for Software Development. + (01:19:23, 14 July 2018)
- DCL-11-104, Attachment 12: Revision 10 to CF2.ID2, Software Configuration Management for Plant Operations and Operations Support. + (01:19:28, 14 July 2018)
- DCL-11-104, Attachment 11: Revision 8 to Procedure CF2, Computer Hardware, Software and Database Control. + (01:19:34, 14 July 2018)
- DCL-11-104, Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines. + (01:19:40, 14 July 2018)
- ULNRC-06051, Callaway, Unit 1, Attachment 2 to ULNRC-06051, Operating Quality Assurance Manual (Oqam), Revision 30 + (01:31:46, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Appendix a + (02:06:47, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14 - Figure 14.3-1 Though Figure 14.3-129 + (02:06:52, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14 - Figure 14.2-0 Through Figure 14.2-18 + (02:06:56, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14 - Figure 14.0-1 Through Figure 14.1-67 + (02:07:00, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 13, Tests and Operations + (02:08:18, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 12, Conduct of Operations + (02:08:22, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 11 - Figure 11.1-1 + (02:08:27, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 11 - Figure 11B-1 Through Figure 11B-5 + (02:08:31, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 11, Waste Disposal and Radiation Protection System + (02:08:37, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Table of Contents + (02:08:41, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 10 - Figures 10.1-1a Through 10.2-9 + (02:08:45, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 10 - Steam and Power Conversion System + (02:08:49, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 9 - Figures 9.2-1 Through 9.9-1 + (02:08:58, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 9 - Figures 9.5-1 Through 9.5-5 + (02:09:03, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 9 - Auxiliary and Emergency Systems + (02:09:12, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 8 - Figures 8.2-1 Through 8.2-17 + (02:09:20, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 8 - Figure 8.2-4 + (02:09:23, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 8 - Electrical Systems + (02:09:28, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 10 - Figure 10.2-1 Through Figure 10.2-7 + (02:09:49, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 7 - Figure 7.2-34 Through Figure 7.2-32 + (02:09:54, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 7 - Figure 7.1-1 Through Figure 7.6-3 + (02:09:58, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 7 - Instrumentation and Control + (02:10:07, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 6 - Engineered Safety Features + (02:10:19, 14 July 2018)