Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Instructions and Key + (15:42:03, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Appendix a, Introduction + (15:42:07, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 14, Figures + (15:42:11, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 14 - Safety Analysis + (15:42:19, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 13 - Tests and Operations + (15:42:26, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 12 - Conduct of Operations + (15:42:33, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 11, Drawings + (15:42:39, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures + (15:42:46, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Waste Disposal and Rad Protection System + (15:42:51, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings + (15:42:56, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures + (15:43:00, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 10, Steam and Power Conversion System + (15:43:04, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings + (15:43:07, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures + (15:43:11, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Auxiliary and Emergency Systems + (15:43:17, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Electrical Systems + (15:43:24, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 7 - Section 7.3 Drawings + (15:43:33, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings + (15:43:56, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures + (15:43:59, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 7 - Section 7.2 Figures + (15:44:03, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 7 - Instrumentation and Control + (15:44:09, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 6 - Section 6.3 Drawings + (15:44:19, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 6 - Section 6.2 Figures + (15:44:25, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 6 - Engineered Safety Features + (15:44:32, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 5 - Section 5.3 Drawings + (15:44:42, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 4 - Section 4.3 Drawings + (15:44:46, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 4 - Section 4.2 Figures + (15:44:50, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 5 - Section 5.2 Figures + (15:44:54, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 5 - Containment Systems + (15:45:00, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections + (15:45:21, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 4 - Reactor Coolant System + (15:45:28, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 3 - Section 3.2 Figures + (15:45:48, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 2 - Section 2.2, Figures + (15:45:51, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 2, Site and Environment + (15:46:00, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual + (15:46:07, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 1, Figures + (15:46:11, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 1, Introduction and Summary + (15:46:16, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 25 + (15:46:37, 13 July 2018)
- ULNRC-06145, Callaway, Unit 1 - Pressure and Temperature Limits Report + (15:51:21, 13 July 2018)
- NL-14-122, Indian Point, Unit 2 - Calculation FEX-00204, Rev. 1, Station Battery 22 System Calculation, Part 1 of 2 + (15:52:58, 13 July 2018)
- NL-14-122, Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 2 of 2 + (15:53:22, 13 July 2018)
- NL-14-122, Indian Point, Unit 2 - Calculation IP-CALC-14-00028, Rev. 0, Station Battery 22 System Calculation - Analysis Variation with an Battery Aged to 80% Capaciy, Part 1 of 2 + (15:53:43, 13 July 2018)
- NL-14-122, Indian Point, Unit 2 - Proposed License Amendment Regarding an Exigent Change to Technical Specification 3.8.6 Station Battery Surveillance + (16:13:01, 13 July 2018)
- NL-14-106, 10CFR50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project, Indian Point Nuclear Generating Station, Unit Nos. 2 & 3 + (16:25:29, 13 July 2018)
- NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 4 of 5 + (17:21:47, 13 July 2018)
- NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 3 of 5 + (17:21:56, 13 July 2018)
- NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 2 of 5 + (17:22:06, 13 July 2018)
- NL-14-071, Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 1 of 5 + (17:22:20, 13 July 2018)
- RA-14-032, License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. + (17:26:52, 13 July 2018)
- ULNRC-06121, Enclosure 1, Amendment 36, LRA Changes + (17:36:48, 13 July 2018)
- BVY 14-038, Vermont Yankee Nuclear Power Station - 2013 Radioactive Effluent Release Report + (17:50:44, 13 July 2018)