Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-15-020, Indian Point, Unit 2 - Submittal of Netco Report NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels + (13:03:23, 13 July 2018)
- RC-15-0020, Attachment 4 - First Inservice Inspection for Steam Generator a + (13:05:21, 13 July 2018)
- RC-15-0020, Attachment 3 - Final NDE Inspection Reports + (13:05:27, 13 July 2018)
- RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 + (13:05:35, 13 July 2018)
- ULNRC-06177, Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 031 + (13:32:59, 13 July 2018)
- ULNRC-06177, Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 030c + (13:33:10, 13 July 2018)
- RC-14-0191, Enclosure 5 - Alert and Notification System Design Report December 2014 + (14:11:09, 13 July 2018)
- RC-14-0191, Enclosure 4 - Kld TR-486, Revision 5, Development of Evacuation Time Estimates Expanded EPZ Boundary EP-100 Appendix 5 + (14:12:07, 13 July 2018)
- ULNRC-06166, Callaway, Unit 1, Submittal of Revision 32 of Callaway Pump and Valve Inservice Testing Program + (14:37:50, 13 July 2018)
- ULNRC-06168, Callaway Plant, Unit 1, Union Electric Co. Foreign Ownership Control or Influence (FOCI) + (14:41:15, 13 July 2018)
- ULNRC-06168, Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/1995 + (14:41:20, 13 July 2018)
- ULNRC-06168, Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren + (14:41:24, 13 July 2018)
- ULNRC-06168, Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren + (14:41:30, 13 July 2018)
- ULNRC-06168, Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren + (14:41:34, 13 July 2018)
- ULNRC-06168, Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/1995 + (14:41:39, 13 July 2018)
- ULNRC-06168, Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric + (14:41:43, 13 July 2018)
- ULNRC-06168, Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren + (14:41:48, 13 July 2018)
- ULNRC-06168, Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/2012 + (14:41:54, 13 July 2018)
- ULNRC-06168, Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren + (14:42:10, 13 July 2018)
- ULNRC-06168, Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/1994 + (14:42:23, 13 July 2018)
- ULNRC-06168, Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/2010 + (14:42:29, 13 July 2018)
- ULNRC-06168, Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/1922 + (14:42:38, 13 July 2018)
- RC-14-0179, Calculation - DC00040-122 - Loss of Coolant Accident - TSC + (15:09:42, 13 July 2018)
- RC-14-0179, Calculation - DC00040-121 - Steam Generator Tube Rupture - TSC + (15:09:48, 13 July 2018)
- RC-14-0179, Calculation - DC00040-120 - Fuel Handling Accident -TSC + (15:09:53, 13 July 2018)
- RC-14-0179, Calculation - DC00040-119 - Reactor Coolant Pump Locked Rotor - TSC + (15:09:59, 13 July 2018)
- RC-14-0179, Calculation - DC00040-118 - Main Steam Line Break - TSC + (15:10:04, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 14, Figures, Part 1 of 2 + (15:41:57, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Table of Contents + (15:42:00, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Instructions and Key + (15:42:03, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Appendix a, Introduction + (15:42:07, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 14, Figures + (15:42:11, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 14 - Safety Analysis + (15:42:19, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 13 - Tests and Operations + (15:42:26, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 12 - Conduct of Operations + (15:42:33, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 11, Drawings + (15:42:39, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures + (15:42:46, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Waste Disposal and Rad Protection System + (15:42:51, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings + (15:42:56, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures + (15:43:00, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 10, Steam and Power Conversion System + (15:43:04, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings + (15:43:07, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures + (15:43:11, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Auxiliary and Emergency Systems + (15:43:17, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Electrical Systems + (15:43:24, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 7 - Section 7.3 Drawings + (15:43:33, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings + (15:43:56, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures + (15:43:59, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 7 - Section 7.2 Figures + (15:44:03, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 7 - Instrumentation and Control + (15:44:09, 13 July 2018)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 6 - Section 6.3 Drawings + (15:44:19, 13 July 2018)