Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML11301A366 + (03:45:28, 13 January 2025)
- ML11301A362 + (03:45:30, 13 January 2025)
- ML11301A334 + (03:45:31, 13 January 2025)
- ML11301A330 + (03:45:32, 13 January 2025)
- ML11301A326 + (03:45:35, 13 January 2025)
- ML11301A321 + (03:45:36, 13 January 2025)
- ML11301A305 + (03:45:37, 13 January 2025)
- Press Release-II-11-062, NRC Names Senior Resident Inspector for Summer Nuclear Plant Construction Activities + (03:45:39, 13 January 2025)
- Press Release-II-11-061, NRC Names New Resident Inspector at Brunswick Nuclear Plant + (03:45:41, 13 January 2025)
- IR 05000456/2011008 + (03:46:24, 13 January 2025)
- SCH11-038, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, Salem Generating Station, NJPDES Permit NJ0005622 + (03:46:27, 13 January 2025)
- ML11301A242 + (03:46:29, 13 January 2025)
- ML11301A241 + (03:46:30, 13 January 2025)
- ML11301A230 + (03:46:33, 13 January 2025)
- ML11301A229 + (03:46:36, 13 January 2025)
- ML11301A226 + (03:46:37, 13 January 2025)
- ML11301A225 + (03:46:39, 13 January 2025)
- ML11301A223 + (03:46:40, 13 January 2025)
- ML11301A222 + (03:46:43, 13 January 2025)
- IR 05000331/2011405 + (03:46:44, 13 January 2025)
- L-2011-450, Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report + (03:47:13, 13 January 2025)
- ML11301A199 + (03:47:15, 13 January 2025)
- ML11301A187 + (03:47:16, 13 January 2025)
- ML11301A114 + (03:47:19, 13 January 2025)
- ML11301A112 + (03:47:22, 13 January 2025)
- NRC-2011-0204, Comment (12) Donald Harrison, on NRC-2011-0204-0001, Proposed Generic Communication; Draft NRC Generic Letter 2011-XX: Seismic Risk Evaluations for Operating Reactors + (03:47:24, 13 January 2025)
- ML11301A099 + (03:47:30, 13 January 2025)
- Press Release-11-205, NRC Seeks Public Input on Draft Environmental Impact Statement for Fermi New Reactor; Meetings Scheduled Dec. 15 + (03:47:31, 13 January 2025)
- ML11301A075 + (03:47:33, 13 January 2025)
- ML11301A074 + (03:47:35, 13 January 2025)
- ML11301A073 + (03:47:37, 13 January 2025)
- ML11301A072 + (03:47:38, 13 January 2025)
- 05000335/LER-2011-001, For St. Lucie, Unit 1, Regarding Unit 1 Manual Reactor Trip Due to High Condenser Backpressure Caused by Severe Influx of Jellyfish Into the Intake Structure + (03:47:44, 13 January 2025)
- ML11301A069 + (03:47:45, 13 January 2025)
- ML11301A034 + (03:47:48, 13 January 2025)
- ML11301A026 + (03:47:49, 13 January 2025)
- IR 05000255/2011013 + (03:47:51, 13 January 2025)
- ML113010502 + (03:47:53, 13 January 2025)
- ML113010501 + (03:47:55, 13 January 2025)
- IR 05000413/2011004 + (03:48:05, 13 January 2025)
- 05000275/LER-2011-006, For Diablo Canyon, Unit 1, Regarding Loss of Control Room Envelope Due to the Work Control Shift Foreman Incorrectly Authorizing Removal of a Blank Flange + (03:48:10, 13 January 2025)
- IR 05000424/2011004 + (03:48:27, 13 January 2025)
- IR 05000321/2011004 + (03:48:29, 13 January 2025)
- IR 05000390/2011004 + (03:48:31, 13 January 2025)
- IR 05000327/2011004 + (03:48:43, 13 January 2025)
- IR 05000269/2011004 + (03:48:50, 13 January 2025)
- ML113010403 + (03:48:52, 13 January 2025)
- PNP 2011-067, Response to Request for Additional Information - LAR to Extend the Containment Type a Leak Rate Test Frequency to 15 Years + (03:48:53, 13 January 2025)
- ML113010392 + (03:48:55, 13 January 2025)
- ULNRC-05821, Union Electric Co. Application for Amendment to Facility Operating License NPF-30 (Ldcn 10-0036) Revision of Technical Specification 3.3.8 TAC ME5173) + (03:48:57, 13 January 2025)
- GNRO-2011/00096, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme Grand Gulf Nuclear Station + (03:48:59, 13 January 2025)