Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-06358, Callaway Plant, Unit 1 - Submittal of Radiology Emergency Response Plan (Rerp), Revision 48 + (17:18:31, 12 July 2018)
- NL-17-002, Indian Point Nuclear Generating, Units 2 and 3, IP-RPT-16-00077, RAI CLI-16-07 MACCS2 Sensitivities, Rev. 0 (Jan. 4, 2017) + (18:13:46, 12 July 2018)
- NL-17-015, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Saf + (18:41:46, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 + (19:10:01, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 11 - Ameren Corporation By-Laws Effective 12/11/2015 + (19:10:05, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/2016 + (19:10:11, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/2016 + (19:10:18, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016 + (19:10:24, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 5 - 10-K Filed Period 12/31/2015 + (19:10:28, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 4 - 2015 Annual Report (Include 2014 Form 10-K) + (19:10:41, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation + (19:10:47, 12 July 2018)
- ULNRC-06341, Callaway Plant Unit 1 - Renewed Facility Operating License NPF-30 -Foreign Ownership Control or Influence (FOCI) + (19:10:50, 12 July 2018)
- NL-16-133, Indian Point, Unit 3, IP-CALC-16-00079, Rev. 0, Evaluation of Leak on Weld 8297 on 31 Fan Cooler Unit Return Line. + (19:37:21, 12 July 2018)
- NL-16-108, LER 15-001-01 for Indian Point 2 Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable Containment Caused by a Service Water Pipe Leak with a Flaw Size That Results in Exceeding the Allowed Leakage Rate for Conta + (19:58:54, 12 July 2018)
- NL-16-109, Indian Point 2 Improved Technical Specifications Bases + (20:00:04, 12 July 2018)
- NL-16-109, Indian Point 2 Technical Requirements Manual + (20:00:17, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents + (20:00:21, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key + (20:00:24, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis.Figures 14.3-1 to 14.3-129 + (20:00:32, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.2-0 to 14.2-18 + (20:00:36, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-67 + (20:00:43, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis + (20:01:03, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations + (20:01:12, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations + (20:01:15, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 + (20:01:20, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-5 + (20:01:36, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System + (20:01:42, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-7 + (20:02:04, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-9 + (20:02:46, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System + (20:02:51, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Drawing No. 9321-F-2736-130 to Drawing No. 138248-9 + (20:03:52, 12 July 2018)
- NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Figures 9.2-1 to 9.9-1 + (20:05:13, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems + (20:05:22, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Drawings + (20:06:33, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures + (20:07:32, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems + (20:07:42, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings + (20:07:50, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures + (20:08:02, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control + (20:08:11, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings + (20:08:48, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures + (20:09:21, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features + (20:09:37, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing + (20:09:54, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures + (20:09:58, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems + (20:10:07, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings + (20:10:11, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures + (20:10:27, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System + (20:10:36, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures + (20:10:42, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 2, Site & Environment, Figures + (20:10:56, 12 July 2018)
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 2, Site & Environment + (20:11:11, 12 July 2018)