Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-2002-005, Re Unexpected auto-start of Turbine Driven Auxiliary Feedwater Pump at Start of Refueling Outage +
- 05000410/LER-2001-002 +
- ML030230710 +
- ML20205P565 +
- ML20217F370 +
- ML20217E022 +
- ML20214W009 +
- 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with +
- 1CAN118505, Monthly Operating Rept for Oct 1985 +
- 1CAN078307, Monthly Operating Rept for June 1983.W/corrected +
- 05000498/LER-1989-007, :on 890208,operational Test for Gaseous Waste Processing Sys Oxygen Analyzer Exceeded Surveillance Period. Caused by Personnel Error.Monthly Analog Channel Operational Test Performed & Procedure for Shift Revised +
- 05000278/LER-1986-010-01, :on 860411,automatic Actuation of Reactor Protection Sys & Group 2 & 3 Isolations Occurred.Caused by Feedpump Min Flow Bypass Valves (AO-3139A,B & C) Failure Creating Low Reactor Water Level.Valves Fixed +
- 05000423/LER-1988-017, :on 880425,4 H Sample Flow Rate Estimate Not Performed Per Tech Spec 3.3.3.10.Caused by Personnel Error. Written Communications Between Depts Required When Directing Another Dept to Comply W/Tech Spec Action +
- 05000293/LER-1995-007, :on 950804,simulated Automatic Test Was Not Performed for Automatic Depressurization Sys Prior to Plant Restart from Refueling outage-10 Due to Personnel Error. Performed Required SAA Surveillance Test +
- 05000259/LER-1995-001-04, :on 950629,EECW Pump Auto Started During Performance of SI as Result of Jumpering Wrong Relay Contacts Due to Personnel Error.Field Wiring for EECW Pump B1 Modified +
- 05000353/LER-1991-010-02, :on 910525,EDG Sys Nonvalid Failure Occurred During Valid Test.Caused by Improperly Operating Auxiliary Test Start Relay.No Corrective Actions Performed +
- 05000334/LER-1990-016-01, :on 901024,ESF Actuation - Low Head Safety Injection Recirculation Valve Closed During Testing +
- 05000461/LER-1993-006, :on 931206,manual Scram Occurred Due to Decreasing Reactor Water Level.Caused by High Rotor Thrust Trip of Only Available Reactor Feedwater Pump.Procedures Revised +
- 05000261/LER-1983-011-03, /03L-0:on 830605,circuit Breaker for Boron Injection Tank Heater Channel B Tripped.Caused by Component Failure Due to Normal End of Life.Failed Heater Replaced +
- 05000311/LER-1981-078-03, /03L-0:on 810727,individual Rod Position Indicator & Control Rod Bank Demand Indicator for Rod 2C1 Were in Disagreement.Caused by Calibr Drift of Individual Rod Position Indicator.Indicator Recalibr +
- 05000324/LER-1981-081-03, /03L-0:on 810804,following Reactor Scram W/Group I Isolation,Safety Relief Valve F013B Opened to Control Reactor Pressure Resulting in Average Torus Temp Exceeding 120 F.Cause Not Stated.Temp Reduced +
- 05000271/LER-1989-026, :on 891223 & 900105,primary Containment Isolation Sys Group III Isolation & Standby Gas Treatment Sys Initiations Occurred.Caused by Failure of Sensor Converter.Isolation Reset & Monitor Bypassed +
- ML20199C809 +
- 05000335/LER-1999-002-01, :on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With +
- 05000331/LER-1998-006, :on 980519,discovered That Visual Exam Had Not Been Performed on Standby Liquid Control Sys Explosive Valves Prior to Returning Sys to Svc.Caused by Failure to Identify Requirement to Perform VT-2 Exam.Procedure Revised +
- 05000354/LER-1997-004, :on 970207,B Div Primary Containment Isolation Sys Isolation Occurred.Caused by Personnel Error During Troubleshooting.Failed Optical Isolator Replaced & Channel Calibr Satisfactorily Completed on 970208 +
- 05000293/LER-1997-016, :on 971105,recirculation Sys Loop B Pump Trip Was Noted.Caused by Sp Inadequacy.Revised Procedure +