Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136F961 + (ML20136F961)
- ML20136F965 + (ML20136F965)
- ML20136F967 + (ML20136F967)
- ML20136F968 + (ML20136F968)
- ML20136F969 + (ML20136F969)
- ML20136F970 + (ML20136F970)
- ML20136F974 + (ML20136F974)
- ML20136F975 + (ML20136F975)
- ML20136F977 + (ML20136F977)
- ML20136F981 + (ML20136F981)
- ML20136F992 + (ML20136F992)
- ML20136F996 + (ML20136F996)
- ML20136F998 + (ML20136F998)
- ML20136G003 + (ML20136G003)
- ML20136G004 + (ML20136G004)
- ML20136G006 + (ML20136G006)
- ML20136G007 + (ML20136G007)
- ML20136G009 + (ML20136G009)
- ML20136G010 + (ML20136G010)
- 05000278/LER-1985-024-02, :on 851125,RWCU Received Unexpected Isolation Signal.Caused by Error on Blocking Permit Which Required Removal of Fuse Not Associated W/Work Being Performed. Operator Counseled + (ML20136G012)
- ML20136G014 + (ML20136G014)
- ML20136G017 + (ML20136G017)
- NSD-NRC-97-5018, Submits Responses to Four NRC Open Items Re Piping Identified as Action W in Encl 7 of NRC .Responses & Associated SSAR Revs Permit Staff to Close Out Open Items in Section 3.12 & Provide FSER Input + (ML20136G018)
- ML20136G019 + (ML20136G019)
- ML20136G020 + (ML20136G020)
- ST-HL-AE-1558, Final Deficiency Rept Re Physical Separation of Electrical Circuits.Initially Reported on 850912.Corrective Actions Include Use of Thermolog Wrap as Physical Separation Barrier & Rearrangement of Cable to Provide Separation + (ML20136G022)
- ML20136G023 + (ML20136G023)
- ML20136G025 + (ML20136G025)
- ML20136G028 + (ML20136G028)
- ML20136G029 + (ML20136G029)
- ML20136G031 + (ML20136G031)
- ML20136G033 + (ML20136G033)
- ML20136G035 + (ML20136G035)
- ML20136G036 + (ML20136G036)
- ML20136G038 + (ML20136G038)
- ML20136G039 + (ML20136G039)
- 05000364/LER-1985-014-01, :on 851121,new Fuel Assembly T-15 Damaged During Removal of Fuel Assembly from Shipping Container. Caused by Personnel Error.Personnel Counseled & Instructions Added to Fuel Handling Procedure + (ML20136G040)
- ML20136G042 + (ML20136G042)
- ML20136G043 + (ML20136G043)
- ML20136G046 + (ML20136G046)
- ML20136G048 + (ML20136G048)
- ML20136G051 + (ML20136G051)
- ML20136G052 + (ML20136G052)
- PNO-IV-85-058A, on 851118,administrative 5% Thermal Power Limit of Section 2c of License NPF-40 Exceeded.Caused by Shift Supervisor Misunderstanding Commission Vote on Full Power License.Shift Supervisor Disciplined + (ML20136G053)
- ML20136G056 + (ML20136G056)
- ML20136G057 + (ML20136G057)
- ML20136G058 + (ML20136G058)
- ML20136G060 + (ML20136G060)
- 05000354/LER-1997-004, :on 970207,B Div Primary Containment Isolation Sys Isolation Occurred.Caused by Personnel Error During Troubleshooting.Failed Optical Isolator Replaced & Channel Calibr Satisfactorily Completed on 970208 + (ML20136G061)
- ML20136G062 + (ML20136G062)
- ML20136G063 + (ML20136G063)