Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20034H902 + (ML20034H902)
- ML20034H903 + (ML20034H903)
- ML20034H905 + (ML20034H905)
- 05000369/LER-1993-002-01, :on 930216,discovered Portion of Containment Spray Sys Channels Between Process Instrumentation & ESF Actuation Logic Improperly Tested.Caused by Deficient Written Communications.Procedures Changed + (ML20034H907)
- SNRC-2052, Forwards Listing of Nuclear Property Insurance in Force at Shoreham Nuclear Power Station + (ML20034H908)
- ML20034H910 + (ML20034H910)
- ML20034H911 + (ML20034H911)
- ML20034H912 + (ML20034H912)
- ML20034H914 + (ML20034H914)
- 05000334/LER-1993-004, :on 930218,condition Identified Which Could Have Prevented Fulfillment of Sys to Control Release of Radioactive Matl.Eops Revised to Diagnose Problems Based on Increasing VCT Level + (ML20034H916)
- SNRC-2043, Informs NRC of Organizational Changes to Shoreham Decommissioning Project.Nuclear Engineering Div & Decommissioning Engineering Div Consolidated + (ML20034H917)
- ML20034H918 + (ML20034H918)
- ML20034H919 + (ML20034H919)
- PY-CEI-NRR-1627, Forwards Licensee Events Repts 92-020-01 & 93-007 for Perry Nuclear Power Plant + (ML20034H921)
- ML20034H923 + (ML20034H923)
- ML20034H925 + (ML20034H925)
- 05000334/LER-1993-003-01, :on 930217,electrical Noise Spike Caused Spurious High Radiation Alarm on CR Radiation Monitor & Actuated CR Emergency Habitability Sys.Operating Procedure 1/2.44.4A Performed + (ML20034H926)
- ML20034H927 + (ML20034H927)
- ML20034H928 + (ML20034H928)
- ML20034H931 + (ML20034H931)
- 05000440/LER-1993-007, :on 930218,determined That Snubbers May Have Been Inoperable Since 1992 Nonconformance Rept.Caused by Dried Out Lubricant Resulting from Exposure to Elevated Temps.All Snubbers Will Be Functionally Tested + (ML20034H933)
- 05000336/LER-1993-003, :on 930217,discovered That Mispositioned HPSI Valve Would Have Rendered Facility 1 HPSI Sys Inoperable Due to Inadequate Procedural Guidance.Affected Valve Returned to Correct Position & Appropriate Sps Revised + (ML20034H935)
- ML20034H936 + (ML20034H936)
- ML20034H937 + (ML20034H937)
- ML20034H939 + (ML20034H939)
- ML20034H940 + (ML20034H940)
- BECO-LTR-93-036, 1992 Statistical Summary Rept + (ML20034H941)
- ML20034H942 + (ML20034H942)
- ML20034H943 + (ML20034H943)
- ML20034H944 + (ML20034H944)
- ML20034H945 + (ML20034H945)
- 0CAN039303, Forwards Update on Status of Historical Commitments from 1985 to Present,Which Require Clarification or Change + (ML20034H947)
- ML20034H949 + (ML20034H949)
- ML20034H951 + (ML20034H951)
- ML20034H952 + (ML20034H952)
- ML20034H954 + (ML20034H954)
- ML20034H956 + (ML20034H956)
- 05000346/LER-1993-001, :on 930219,discovered That Door to Emergency Airlock Vestibule Was Not Locked Since 930217.Caused by Insufficient Training.Personnel Trained & Sign Will Be Installed Near Door + (ML20034H957)
- ML20034H959 + (ML20034H959)
- ML20034H961 + (ML20034H961)
- ML20034H963 + (ML20034H963)
- ML20034H964 + (ML20034H964)
- ML20034H965 + (ML20034H965)
- ML20034H966 + (ML20034H966)
- ML20034H967 + (ML20034H967)
- ML20034H968 + (ML20034H968)
- ML20034H969 + (ML20034H969)
- ML20034H970 + (ML20034H970)
- ML20034H971 + (ML20034H971)
- ML20034H972 + (ML20034H972)
- ML20034H973 + (ML20034H973)