Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19275A100 + (ML19275A100)
- ML19275A101 + (ML19275A101)
- ML19275A104 + (ML19275A104)
- ML19275A105 + (ML19275A105)
- ML19275A106 + (ML19275A106)
- ML19275A107 + (ML19275A107)
- ML19275A108 + (ML19275A108)
- ML19275A110 + (ML19275A110)
- ML19275A111 + (ML19275A111)
- ML19275A112 + (ML19275A112)
- ML19275A114 + (ML19275A114)
- ML19275A115 + (ML19275A115)
- 05000321/LER-1979-062, Forwards LER 79-062/03L-0 + (ML19275A116)
- ML19275A117 + (ML19275A117)
- 05000321/LER-1979-062-03, /03L-0 on 790811:outboard Shutdown Cooling Isolation Valve Was Slow in Opening & Closing.Caused by Valve Maint.Valve Operator Adjusted to Proper Operating Time + (ML19275A118)
- 05000267/LER-1979-021, Forwards LER 79-021/03L-0 + (ML19275A119)
- ML19275A120 + (ML19275A120)
- 05000267/LER-1979-021-03, /03L-1 on 790720:during Review of Surveillance Tests,Discovered That Halon Fire Suppression Sys Surveillance Test for Second Quarter Not Performed.Caused by Inadequate Control & Direction Re Refueling Work Load + (ML19275A121)
- ML19275A122 + (ML19275A122)
- ML19275A123 + (ML19275A123)
- 05000321/LER-1979-068, Forwards LER 79-068/03L-0 + (ML19275A126)
- ML19275A127 + (ML19275A127)
- ML19275A128 + (ML19275A128)
- ML19275A129 + (ML19275A129)
- 05000321/LER-1979-068-03, /03L-0 on 790726:secondary Containment Violated When Support Group Personnel Opened Bldg Airlock Door at Same Time Other Door in Air Lock Was Open.Caused by Design Deficiency.Design Revision Underway & Expected 800101 + (ML19275A130)
- 05000298/LER-1979-005, Forwards LER 79-005/03X-1 + (ML19275A131)
- ML19275A132 + (ML19275A132)
- ML19275A133 + (ML19275A133)
- 05000346/LER-1979-002, Forwards LER 79-002/03L-1 + (ML19275A134)
- ML19275A135 + (ML19275A135)
- 05000346/LER-1979-002-03, /03L-1 on 790102:main Steam Valves 106 & 106A Failed to Open,Resulting in Auxiliary Feed Pump Afp 1-1 Being Taken Out of Operation.Caused by Dirt Buildup on Valve Stems as Result of New Const + (ML19275A136)
- ML19275A137 + (ML19275A137)
- ML19275A139 + (ML19275A139)
- 05000298/LER-1979-015, Forwards LER 79-015/03X-1 + (ML19275A140)
- ML19275A141 + (ML19275A141)
- 05000298/LER-1979-015-03, /03X-1 on 790525:breaker 1AS Failed to Close Automatically After Reactor Scrammed.Caused by Improper Operations of Switch 52 in Breaker 1AN.Breaker 1FA Failed to Trip.Caused by Misaligned Trip Coil & Armature + (ML19275A142)
- ML19275A143 + (ML19275A143)
- 05000325/LER-1979-054, Forwards LER 79-054/03L-0 + (ML19275A144)
- ML19275A145 + (ML19275A145)
- ML19275A146 + (ML19275A146)
- 05000325/LER-1979-054-03, /03L-0 on 790805:while Pulling Control Rod on Power Increase Following Startup,Rod Block Monitor Channel a Failed.Caused by Defective Filter Capacitator in Vdc Power Supply.Capacitator Replaced & Instrument Returned to Svc + (ML19275A147)
- ML19275A148 + (ML19275A148)
- ML19275A149 + (ML19275A149)
- ML19275A150 + (ML19275A150)
- ML19275A151 + (ML19275A151)
- ML19275A152 + (ML19275A152)
- ML19275A153 + (ML19275A153)
- ML19275A159 + (ML19275A159)
- ML19275A160 + (ML19275A160)
- ML19275A161 + (ML19275A161)
- ML19275A162 + (ML19275A162)