Search results

Jump to navigation Jump to search
Results 1 – 20 of 136,265
Advanced search

Search in namespaces:

  • Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63 14-Day Special Report for Accident Radiation Monitors Ladies and Gentlemen: In accordance
    6 KB (836 words) - 07:17, 22 October 2019
  • DPR-38, DPR-47, and DPR-55 Special Report per Technical Specification 5.6.6 Action Request No.: 02069527 Special Report per Technical Specification 5.6.6
    10 KB (1,540 words) - 12:51, 30 October 2019
  • ML18061A118 (category Licensee 30-Day Written Event Report)
    decision not to report the event. RTR#1 wants to hear how the conversation goes with NRC. 1642 SRO#2 emails rough draft of event notification report for UFTR
    23 KB (3,604 words) - 18:31, 21 October 2019
  • Docket Number 50-414 Special Report 2018-01 for the Unit 2 Loose Parts Monitoring System Non-Functional for Greater than 30 Days In accordance with Required
    8 KB (1,304 words) - 03:29, 22 October 2019
  • ML17279A109 (category Licensee 30-Day Written Event Report)
    assumption that Thermo Scientific would be able to provide a solution later that day. SRO 1 was in contact with Thermo Scientific three separate times on the morning
    12 KB (1,911 words) - 08:22, 4 February 2020
  • Vertical Tendon (V281) Failure - Final Report Reference(s) 1. U.S. Nuclear Regulatory Commission Operations Center Event Notification No. 52476, dated January
    5 KB (669 words) - 19:27, 21 October 2019
  • Environmental Protection Plan Report Event Dates: February 4, 2019 and February 11, 2019 Unusual or Important Environmental Event - Turtle Mortalities On February
    4 KB (575 words) - 01:02, 20 October 2019
  • ML18116A446 (category Licensee 30-Day Written Event Report)
    20555-0001 Special Report-Event Notification #53321 Operating License R-87, Docket 50-182 Technical Specification 6.7.b.1.c.vi This special report details a Technical
    9 KB (1,216 words) - 08:37, 23 February 2020
  • ML110970151 (category Licensee 30-Day Written Event Report)
    have been reported to ESI." 04/01/2011 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Paze 2 General Information (PAR) Event# 45459 Palo
    19 KB (2,681 words) - 05:09, 11 March 2020
  • NRC 2014-0029, CFR 50.46 Annual Report/30-Day Report (category Licensee 30-Day Written Event Report)
    Annual Report/30-Day report In accordance with 10CFR50.46(a)(3)(ii), NextEra Energy Point Beach, LLC (NextEra) is submitting this annual report of changes
    8 KB (1,271 words) - 09:25, 11 November 2019
  • ML11347A193 (category Licensee 30-Day Written Event Report)
    supports a 30-day LCO operational window, per Oconee Technical Specification 3.5.2. New partial-power SBLOCA analyses to support the 30-day LCO window
    14 KB (1,869 words) - 12:00, 12 November 2019
  • SVPLTR 09-0027, Written Follow Up Report on Release of Radionuclide (category Licensee 30-Day Written Event Report)
    Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities 2023-06-20 [Table view] Category:Licensee 30-Day Written Event Report MONTHYEARRS-11-124
    601 bytes (7 words) - 05:10, 14 November 2019
  • ML040760756 (category Licensee 30-Day Written Event Report)
    following Special Report concerning the inoperability of the Channel #11 Containment Hydrogen Monitoring System. Description of Event On February 23, 2004
    2 KB (265 words) - 23:05, 18 March 2020
  • ML020500237 (category Licensee 30-Day Written Event Report)
    the following Special Report concerning the inoperability of Channel #11 Containment Hydrogen Monitoring System. Descriptionof Event On January 8, 2002,
    2 KB (297 words) - 02:02, 28 March 2020
  • ML020580195 (category Licensee 30-Day Written Event Report)
    following Special Report concerning the inoperability of Channel #12 Suppression Chamber Water Level indicator. Description of Event On January 25, 2002
    2 KB (323 words) - 23:45, 27 March 2020
  • ML17252A836 (category Licensee 30-Day Written Event Report)
    I ' '\ BBS Ltr. #30-75 Dresden Nuclear Power Station R. R. #1 Morris, Illinois 60450 January 14, 1975 JI Assistant Director for Construction and Operations
    2 KB (250 words) - 12:05, 4 February 2020
  • ML17252A291 (category Licensee 30-Day Written Event Report)
    1 I LI oI RI sj 31 7 B 9 14 15 25 2S 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE OOClCET NUMBER EWl!IT CATE REPORT CATE @ill CON1' I I I LIJ tU 01 s I o
    14 KB (1,625 words) - 12:16, 4 February 2020
  • ML17252A171 (category Licensee 30-Day Written Event Report)
    August 8, 1975 * ,- 3) Drawing Number M..,.359 12E2506 . Report Number:;P 50-249/75--34 Report D:=i-te: August 13, 1975 Occurrence Date: August 7, 1975
    5 KB (577 words) - 12:21, 4 February 2020
  • ML17252A827 (category Licensee 30-Day Written Event Report)
    February 10, 1975 -' * . I, 3) Drawµig Number: P & ID M-349 Report Number: 50-249/1975-5 Report Date: . February 14, 1975 Occurrence Date: February 8, 1975'-'
    4 KB (590 words) - 12:05, 4 February 2020
  • ML17252A174 (category Licensee 30-Day Written Event Report)
    Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 REPORT OF ABNORMAL OCCURRENCE PER SECTION 6.6.A OF THE TECHNIC -SPECIFICATIONS
    4 KB (591 words) - 12:21, 4 February 2020
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)