Search results
Jump to navigation
Jump to search
Did you mean: lqt page connected to flow
- inoperable pump minimum flow instrumentation: Core Spray Pump Discharge Flow - Low, Low Pressure Coolant injection j Discharge Flow - Low, and High Pressure...60 KB (11,656 words) - 08:28, 10 December 2024
- EA-ELEC-AMP-041 Page 43 of RemarkS* ~. .:.1 The t~tdata for Conduit X1568 was u:sed ~o determine the appropriate ambient ~mperature to be.used to calrulate the...197 KB (27,946 words) - 07:42, 6 January 2025
- average flow rates for the vents and,sample pumps are averaged for the duration of the sampling period, and a ratio of vent flow rate to sample flow rate...43 KB (8,434 words) - 12:03, 6 January 2025
- pt\\cdoc\\odem.rv4 . + - --m.--- r - w ODCM PAGE CHANGE CHANGE NO. 4 DATE: 2/27/96 PAGE DATE PAGE DATE PAGE DATE PAGE DATE Cover 2/96 22 1/92 52 1/92 82 3/93...135 KB (25,397 words) - 20:35, 11 December 2024
- background to a MEMBER OF THE PUBLIC at or beyond the site boundary to less than or equal to 500 mrem / year to the total body or to less than or equal to 3000...43 KB (7,634 words) - 06:11, 20 December 2024
- change to ITS Section 5.6.6. The FLOG continues to pursue the changes proposed by this traveler. ATTACHED PAGES:, CTS 1.0 - ITS 1.0, page 1-4a A, page 4 Enclosure...215 KB (40,527 words) - 06:03, 11 December 2024
- ML20195C393 (category UTILITY TO NRC)(PSS) JUST PRIOR TO DCC TO ROOM CLOSEOUT. 12/19/84 ALLOWED OTNER INTERESTED PARTIES TO KEEP ASREAST OF CNAleGES. SISCO DID NOT WORK TO TseESE 00C1mENTS...59 KB (13,984 words) - 20:51, 10 December 2024
- have tot to provide for any tube mate-ton County Plant. developed plans to convert nal problems which may occur. lower voltage transnussion to The flue...173 KB (33,200 words) - 03:53, 21 December 2024
- NP-Attachment to WBTD-4396 Page 7 of 26 1. WBT-D-1373. WEC to TVA ASTRUM FSAR Package. (Recommend TVA convert this to the counterpart submittal to the NRC.)...114 KB (19,985 words) - 07:07, 11 January 2025
- Agreement, STPNOC will continue to have full control over operations, and will continue to have sole authority to make all decisions to protect public health and...800 KB (121,961 words) - 03:23, 16 March 2020
- setting (TBBD) needs to be changed from 82" to 84.1" to provide the required Alarm Function (6804 gallons) to properly identify to Operators that action...111 KB (22,509 words) - 23:53, 11 January 2025
- typical " flow chimney" readering of the A 5-2 L l ~ 4. -- m=. ? thermal-hydraulic model. The governing equation to characterize the - poo'1 L the flow field...210 KB (40,559 words) - 23:17, 14 December 2024
- Charpy Maximum Prop YMd Time Isami cm Time to Fracture Arreet. Yield Flow Sample Temp Energy Ed/A Ee/A Ep/A Load to Yield Load Maximum Load Load Streme Stree...139 KB (29,805 words) - 07:48, 14 December 2024
- /RQT:en Attachment cc: See Attached Page Two ( h o'Wces u ~ A #9 s t e 's U. S. Nuclear Regulatory Commission Page Two cc: Richard DeYoung, Director Office...53 KB (9,144 words) - 13:55, 13 December 2024
- ML20052E193 (category UTILITY TO NRC)this point single phase __ flow changes to two phase flow. Two phase flow occurs from the area of bubble flow to annular flow. Note in particular that for...130 KB (24,509 words) - 08:18, 18 December 2024
- ML17213B196 (section or completeness and are to be used only zor evaluating unusual circumstances where releases o)The dilution flow in gpm of intake Cooling Water ox Circulating Water Pumps. Incake Cooling flow is 14,500 gpm/pump Circulating Wat.er flow is 121,000 gpm/pump...134 KB (29,829 words) - 16:30, 8 January 2025
- made available to the public, to the Council on Environmental Quality, and to other specified agencies in September 1976. This Addendum to Part II was made...327 KB (58,585 words) - 09:00, 11 December 2024
- 4.1 Liquid Discharge Points to Ohio River 29 4.2 Water Flow Schematic - Shippingport Atomic Power Station 30 4.3 Water Flow Schematic - Beaver Valley Power...161 KB (31,184 words) - 05:24, 14 December 2024
- Monitors overrides to be deleted and go to normal readings. LOT-SIM-JP-300-Kl I Page 7 of 11 REV. 1 SEP Restart RB HVAC with Failure to Isolate PROMPT: When...240 KB (43,263 words) - 05:39, 14 January 2025
- quarter to less than or equal to 1.5 mrems to the whole body and to less than or equal to 5 mrems to any organ, and b. During any calendar year to less than...279 KB (59,879 words) - 08:46, 13 December 2024