Search results
Jump to navigation
Jump to search
- Temperature Limits Report Annual Radioactive Effluent Release Report Foreign Material Exclusion Annual Radiological Environmental Operating Report Operability62 bytes (4 words) - 20:54, 23 February 2020
- Integrated Inspection Report 05000317/2023004 and 05000318/2023004 NEI 99-04, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/2313 bytes (0 words) - 12:16, 11 March 2020
- Station, Ltr, Foreign Ownership, Control, or Influence Information ML0303805962003-01-310Issue date: 31 January 2003 Title: Letter, Foreign Ownership, Control91 bytes (0 words) - 17:44, 27 November 2019
- Facility, S&T and Foreign S&T Forms - These endorsements are issued with respect to all ANI Domestic Facility Fotm, Domestic S&T and Foreign S&T policies reflecting29 KB (4,322 words) - 15:23, 5 January 2024
- Type Issue Number Title Report Section Status NOV 05000317/2022003-01 Failure to Prevent 95001 Closed Introduction of Foreign Material into Emergency Diesel29 KB (4,049 words) - 13:24, 14 November 2023
- WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) (category Status Report)Decommissioning Funding Status Report as of 3/31/2023 (1 page) Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 3/31/2023 Owned28 KB (1,868 words) - 09:57, 22 May 2023
- independent matter, we would observe that grievances on foreign ownership are general in nature -- the foreign ownership restriction protects national, not individual38 KB (5,384 words) - 21:29, 6 October 2021
- South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update Foreign Ownership, Control, or Influence (FOCI) The attachment to this letter advises3 KB (370 words) - 02:30, 23 February 2021
- South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update Foreign Ownership. Control. or Influence (FOCI) The attachment to this letter advises3 KB (364 words) - 19:40, 18 January 2022
- NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report (category Inservice/Preservice Inspection and Test Report)Inspection Report Enclosure 1R24 Steam Generator Tube Inspection Report Enclosure to NL-23-0745 1R24 Steam Generator Tube Inspection Report Introduction44 KB (5,969 words) - 23:42, 12 October 2023
- AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report (category Report)Condition Monitoring for Foreign Object Wear Two volumetric wear indications were reported during U1C31 that were attributed to foreign object wear. Both indications42 KB (6,393 words) - 16:59, 9 November 2022
- 50-498, STN 50-499 Annyal Dose Report for 2020 Pursuant to the requirements of 10 CFR 20.2206(c), the Annual Dose Report covering the previous year is to2 KB (234 words) - 16:26, 19 January 2022
- Docket Nos. STN 50-498 and STN 50-499 Annual Fitness for Duty Performance Report for 2020 Pursuant to 10 CFR 26.717(f), 10 CFR 26.211(g), and 10 CFR 26.203(e)2 KB (204 words) - 20:34, 19 January 2022
- NOC-AE-21003816, Commitment Change Summary Report (category Report)STN 50-499 Commitment Change Summary Report Attached is the South Texas Project (STP) Commitment Change Summary Report for the period June 21, 2019 through3 KB (471 words) - 21:52, 18 January 2022
- Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-300305 KB (678 words) - 18:42, 20 January 2022
- Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-300303 KB (393 words) - 03:44, 7 February 2021
- Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-300305 KB (779 words) - 02:19, 7 February 2021
- Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-300304 KB (377 words) - 03:20, 21 March 2023
- ML23331A798 (category Inspection Report)Tube Inspection Report cc: Listserv OCONEE NUCLEAR STATION, UNIT 1 NRC STAFF REVIEW OF THE FALL 2022 STEAM GENERATOR TUBE INSPECTION REPORT (O1R32) DOCKET6 KB (905 words) - 17:55, 5 January 2024
- Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Containment." The generic letter addresses the NRC staff's concems18 KB (2,315 words) - 23:27, 3 July 2022