Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes optionsShow last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 22:18, 24 February 2026
 
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

21 February 2026

     03:10  05000364/LER-2025-001, Joseph Farley, Unit 2, Containment Isolation Valve Inoperable for Longer than Allowed by Technical Specifications diffhist +12 StriderTol talk contribs (StriderTol Bot change)
     02:29  05000364/LER-2025-002, Nuclear Plant, Unit 2, Two Pressurizer Safety Valves Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift diffhist −7,441 StriderTol talk contribs (StriderTol Bot change)
     02:03  05000364/LER-2025-003, Automatic Reactor Trip Due to Low Steam Generator Level diffhist +4,129 StriderTol talk contribs (StriderTol Bot change)
     02:03  05000364/LER-2025-004, Manual Reactor Trip Due to Loss of Main Condenser Vacuum diffhist +5,921 StriderTol talk contribs (StriderTol Bot change)
     01:49  05000348/LER-2025-001 diffhist −29 StriderTol talk contribs (StriderTol Bot change)
     01:49  05000348/LER-2025-001, Nuclear Plant, Unit 1 and 2, Emergency Diesel 1C Unable to Achieve 110% of Maximum Load diffhist −6,186 StriderTol talk contribs (StriderTol Bot change)