Create Inspection: Level is steady, between 80 and 90% actual level Charging Pumps A and C are operating, charging at 88 gpm Letdown flow is steady at approximately 80 gpm

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


Name:
Inspection Performed By

Performed by:
Inspection Procedure(s):
Lead inspector:
Inspectors:
Target

Site:
Start date:
End date:
Site inspection lead:
Licensing lead:
Local location:
Preparation

Action plan:
Self-assessment:
Inspection Results

Exit time
Exit location
Exit Minutes:
Attendance:
Inspection report:
Inspection finding:

Free text:

Cancel