Create Inspection: Holds a shift brief to address the pressurizer level change and actions to diagnose a possible leak. The cooldown rate is slowed from 25°F/hour to 13°F/hour. 0842 to 0847 During this time period, the

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


Name:
Inspection Performed By

Performed by:
Inspection Procedure(s):
Lead inspector:
Inspectors:
Target

Site:
Start date:
End date:
Site inspection lead:
Licensing lead:
Local location:
Preparation

Action plan:
Self-assessment:
Inspection Results

Exit time
Exit location
Exit Minutes:
Attendance:
Inspection report:
Inspection finding:

Free text:

Cancel