Create Inspection: Has reported this event under the occupational exposure cornerstone and the associated performance indicator. The inspectors observed radiography operations conducted in the Unit 1 containment on July 19-20,2010, and verified that

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


Name:
Inspection Performed By

Performed by:
Inspection Procedure(s):
Lead inspector:
Inspectors:
Target

Site:
Start date:
End date:
Site inspection lead:
Licensing lead:
Local location:
Preparation

Action plan:
Self-assessment:
Inspection Results

Exit time
Exit location
Exit Minutes:
Attendance:
Inspection report:
Inspection finding:

Free text:

Cancel