Create Inspection: -2207, Step 4.14.14. 0600 Shift turnover. Plant cooldown is still 'in-progress' with main steam atmospheric dump valves open, but is essentially stopped because of the reduced steaming capability with

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


Name:
Inspection Performed By

Performed by:
Inspection Procedure(s):
Lead inspector:
Inspectors:
Target

Site:
Start date:
End date:
Site inspection lead:
Licensing lead:
Local location:
Preparation

Action plan:
Self-assessment:
Inspection Results

Exit time
Exit location
Exit Minutes:
Attendance:
Inspection report:
Inspection finding:

Free text:

Cancel