TXX-3142, Responds to NRC Re Violation Noted in IE Insp Repts 50-445/80-08 & 50-446/80-08.Corrective Actions:Cable Was Pulled Back During Investigation of Damage to Cable Jacket & Will Be Replaced +, TXX-3129, Responds to NRC Re Violations Noted in IE Insp Repts 50-445/80-08 & 50-446/80-08.Corrective Actions:Rept Has Been Prepared & Reporting Requirements Have Been Clarified +, TXX-3171, Deficiency Rept Re Use of Architectural Concrete in Floor Slabs When Determining Embedment Length of Hilti Bolts. Survey of Bolts Is Being Conducted.Bolt Installation Procedure Was Revised to Reflect Embedment Lengths +, TXX-3398, Final Deficiency Rept Re pull-out Performance of Hilti Kwik-Bolt Anchors,Initially Reported 801217.Condition Is Not Significant Deficiency & Is Not Reportable Per 10CFR50.55(e) +, TXX-2901 +, TXX-2881 +, TXX-4354 +, TXX-3125 +, TXX-3049 +, TXX-4033 +, TXX-4054, Interim Deficiency Rept Re Temp in Excess of FSAR Parameters Experienced in Annulus Between Reactor Vessel Insulation & Shield Wall.Cooling Increased by Reducing Chilled Water Temp & Installing Addl Cooling Coil +, TXX-4020, Responds to NRC Re Violations Noted in IE Insp Rept 50-446/83-15.Corrective Actions:Only Individuals Authorized by Project Welding Engineering May Void Documentation +, TXX-4031, Responds to NRC Re Violations Noted in IE Insp Rept 50-445/83-23.Corrective Actions:Five Loose Jam Nuts on Large Bore ASME Pipe Supports Reworked & Verified Snug Tight.Extension of Due Date Until 830901 Granted by NRC +, TXX-4042, Interim Deficiency Rept Re High Temp Conditions in Reactor Vessel Support & Neutron Detector Well Areas.Initially Reported on 830729.Completion Anticipated by 830930 +  and TXX-3442, Final Deficiency Rept Re Unauthorized Field Mods to Hilti- Kwik Concrete Anchor Bolts During Installation,Initially Reported on 801001.Bolts Removed or Cut Off & Driven Into Concrete Structures +
05000445  +, 05000446  +  and 00445  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
March 18, 1988  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
12:44:33, 11 December 2024  +
Request  +
March 18, 1988  +
TXX-3142, Responds to NRC Re Violation Noted in IE Insp Repts 50-445/80-08 & 50-446/80-08.Corrective Actions:Cable Was Pulled Back During Investigation of Damage to Cable Jacket & Will Be Replaced +, TXX-3129, Responds to NRC Re Violations Noted in IE Insp Repts 50-445/80-08 & 50-446/80-08.Corrective Actions:Rept Has Been Prepared & Reporting Requirements Have Been Clarified +, TXX-3171, Deficiency Rept Re Use of Architectural Concrete in Floor Slabs When Determining Embedment Length of Hilti Bolts. Survey of Bolts Is Being Conducted.Bolt Installation Procedure Was Revised to Reflect Embedment Lengths +, TXX-3398, Final Deficiency Rept Re pull-out Performance of Hilti Kwik-Bolt Anchors,Initially Reported 801217.Condition Is Not Significant Deficiency & Is Not Reportable Per 10CFR50.55(e) +, TXX-2901 +, TXX-2881 +, TXX-4354 +, TXX-3125 +, TXX-3049 +, TXX-4033 +, TXX-4054, Interim Deficiency Rept Re Temp in Excess of FSAR Parameters Experienced in Annulus Between Reactor Vessel Insulation & Shield Wall.Cooling Increased by Reducing Chilled Water Temp & Installing Addl Cooling Coil +, TXX-4020, Responds to NRC Re Violations Noted in IE Insp Rept 50-446/83-15.Corrective Actions:Only Individuals Authorized by Project Welding Engineering May Void Documentation +, TXX-4031, Responds to NRC Re Violations Noted in IE Insp Rept 50-445/83-23.Corrective Actions:Five Loose Jam Nuts on Large Bore ASME Pipe Supports Reworked & Verified Snug Tight.Extension of Due Date Until 830901 Granted by NRC +, TXX-4042, Interim Deficiency Rept Re High Temp Conditions in Reactor Vessel Support & Neutron Detector Well Areas.Initially Reported on 830729.Completion Anticipated by 830930 +  and TXX-3442, Final Deficiency Rept Re Unauthorized Field Mods to Hilti- Kwik Concrete Anchor Bolts During Installation,Initially Reported on 801001.Bolts Removed or Cut Off & Driven Into Concrete Structures +
Forwards Four Addl Chronologies of Confirmed Issues,Per Board 860808 Request.Chronologies Inadvertently Omitted from Applicants Final Submittal on 880229.Certificate of Svc Encl  +