Browse wiki

Jump to navigation Jump to search
License Condition 2.C.(1) states, in part,License Condition 2.C.(1) states, in part, that the licensee is authorized to operate both units at reactor core power levels not to exceed 3586.6 megawatts thermal. Contrary to this, both units exceeded their license thermal power limits since original construction by approximately 0.5 percent. The licensee identified that the flow coefficient utilized in the reactor power calorimetric calculation was not conservative during a post-maintenance calibration of a new flow instrument. The finding was determined to have very low safety significance because it only involved the potential to affect the fuel barrier. The licensee entered this issue into the CAP as IR 1217236 and implemented the correct flow coefficients.implemented the correct flow coefficients.  +
23:59:59, 30 June 2011  +
05000456  +  and 05000457  +
23:59:59, 30 June 2011  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
15:42:44, 30 May 2018  +
23:59:59, 30 June 2011  +
Licensee-Identified Violation  +