Browse wiki

Jump to navigation Jump to search
NRC Letter, dated June 1, 2012 (ML12153A15NRC Letter, dated June 1, 2012 (ML12153A155), documented an NRC Office of Investigation (OI) review to determine whether a contractor electrician deliberately entered a high radiation area (HRA) without first receiving a health physics (HP) briefing on the current radiological conditions in accordance with site procedures required by NextEras operating license (NRC Investigation Report Number 1-2011-038). The NRC concluded that the contractor electrician, who had been assigned to conduct work within an HRA, deliberately entered the HRA without first receiving the HP briefing on the current radiological conditions. That issue was being treated as an NCV. In order to facilitate entering this issue into the NRCs Plant Issues Matrix and assessment process, this issue was identified as NCV 05000443/2013003-01, Tech Spec 6.10.1 Violation - Contractor Electrician Entered High Radiation Area Without Receiving Health Physics Briefing.Without Receiving Health Physics Briefing.  +
23:59:59, 30 June 2013  +
05000443  +
23:59:59, 30 June 2013  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
21:47:06, 8 October 2017  +
23:59:59, 30 June 2013  +
Tech Spec 6.10.1 Violation - Contractor Electrician Entered High Radiation Area Without Receiving Health Physics Briefing  +