Browse wiki

Jump to navigation Jump to search
The NRC identified a SL IV NCV of 10 CFR 5The NRC identified a SL IV NCV of 10 CFR 50.73(a)(2)(i)(B) for the licensee's failure notify the NRC that the TS LCO 3.6.3 required action and completion time were not met for an inoperable emergency raw cooling water (ERCW) containment isolation valve. Subsequently, the licensee submitted LER 2016-009-00 for this issue on July 15, 2016. This issue was placed in the licensees corrective action program as CR 1174000. Since the failure to submit an event report within the time requirements may impact the ability of the NRC to perform its regulatory oversight function, this performance deficiency was dispositioned under traditional enforcement and the violation was assessed using Section 2.2.4 of the NRCs Enforcement Policy. Using the example listed in Section 6.9.d.9, A licensee fails to make report required by 10 CFR 50.73, the issue was determined to be a SL IV violation. In accordance with IMC 0612, Power Reactor Inspection Reports, dated May 6, 2016, traditional enforcement violations are not assessed for cross-cutting aspects.re not assessed for cross-cutting aspects.  +
23:59:59, 30 June 2016  +
05000390  +
23:59:59, 30 June 2016  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
17:26:24, 1 October 2017  +
23:59:59, 30 June 2016  +
Untimely 10 CFR 50.73 Notification of Inoperable Containment Penetrations  +