An NRC-identified NCV of 10 CFR Part 50, AAn NRC-identified NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, was identified for the licensees failure to implement corrective actions to prevent fouling of the 2B component cooling water (CCW) heat exchanger (HX) that resulted in the number of blocked tubes exceeding the HXs maximum analyzed limit for plugged tubes. The licensees failure to implement adequate corrective actions was a performance deficiency and was within the licensees ability to prevent. Corrective actions included installing temporary equipment to ensure adequate continuous sodium hypochlorite (SH) is injected through the CCW HXs to prevent biological fouling. The licensee entered this issue into the CAP. The performance deficiency was more-than-minor because if left uncorrected, the performance deficiency had the potential to lead to a more significant safety concern. Specifically, inadequate SH injection may cause extensive fouling and can lead to a common mode failure of the CCW HXs preventing the required cooling of safety-related structures, systems, and components (SSCs) analyzed heat loads during a design basis accident (DBA). Using Manual Chapter 0609.04, Significance Determination Process Initial Characterization of Findings, Table 2 dated June 19, 2012, the finding was determined to affect the Mitigating Systems Cornerstone. Manual Chapter 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2 Mitigating Systems Screening Questions, dated, June 19, 2012, was used to further evaluate this finding. The finding screened as Green because the finding did not represent either an actual loss of function of at least a single train for greater than its Technical Specification (TS) Allowed Outage Time, or two separate safety systems out-of-service (OOS) for greater than its TS Allowed Outage Time. The finding involved the cross-cutting area of the resolution component in Problem Identification and Resolution (PI&R) because the organization did not take effective corrective actions to address issues in a timely manner commensurate with the safety significance of the CCW HX, in that, even after the repeat fouling issue had been identified on the 2B CCW HX, the immediate resolution of inadequate SH injection remained unresolved until the inspectors addressed this issue with plant management.rs addressed this issue with plant management.  
23:59:59, 31 December 2015  +
05000335  +  and 05000389  +
23:59:59, 31 December 2015  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:53:46, 21 February 2018  +
23:59:59, 31 December 2015  +
Inadequate Corrective Actions to Prevent Fouling of the CCW HXs  +