Browse wiki

Jump to navigation Jump to search
Unit 1 and Unit 2 technical specificationsUnit 1 and Unit 2 technical specifications LCO 3.7.10 required that if both trains of CREVS become inoperable than LCO 3.0.3 shall be immediately entered. Additionally, LCO 3.0.3 requires both units to be placed in Mode 3 within seven hours if the condition was not rectified. Contrary to the above, on August 10, with both trains of CREVS rendered inoperable, both units remained in Mode 1 for a period of approximately 24 hours. The finding was entered into the licensees CAP as CR 1201905. This finding was assessed using NRC Inspection Manual Chapter (IMC) 0609, Attachment 4, and was determined to be of very low safety significance (Green) due to the finding only representing a degradation of the radiological barrier function provided for the control room.er function provided for the control room.  +
23:59:59, 30 June 2017  +
05000327  +  and 05000328  +
23:59:59, 30 June 2017  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months)  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
15:56:03, 30 May 2018  +
23:59:59, 30 June 2017  +
Licensee-Identified Violation  +