Browse wiki
Jump to navigation
Jump to search
A self-revealing Green NCV of 10 CFR Part … A self-revealing Green NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, and TS 3.7.C.2, Containment Systems Secondary Containment, was identified because Entergy did not establish an appropriate interval to overhaul the secondary containment isolation dampers. As a result, the refueling floor supply isolation dampers were operated beyond the recommended overhaul interval and subsequently failed. Entergys corrective actions included cleaning, lubricating, and post-work testing the failed refueling floor supply isolation dampers. This issue was entered into the CAP as CR 2017-0494. The performance deficiency is more than minor because it is associated with the SSC and barrier performance attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective of providing reasonable assurance that physical design barriers (containment) protect the public from radionuclide releases caused by accidents or events. Specifically, Entergys preventative maintenance (PM) for the refueling floor supply isolation dampers was inadequate to ensure the availability and reliability of SSCs required to maintain secondary containment operable. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 3 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, the inspectors determined that this finding was of very low safety significance (Green) because the performance deficiency only represented a degradation of the radiological barrier function provided by the reactor building and standby gas treatment system (SBGTS). The finding has a cross-cutting aspect in the area of Problem Identification and Resolution - Resolution, in that Entergy personnel did not take effective corrective actions to address issues in a timely manner. Specifically, in 2016, Entergy personnel identified there were deficiencies in the PM program with technical justifications for deferring PMs. Entergy reasonably had the opportunity to identify which PMs were not performed within recommended guidelines and make appropriate changes as needed. (P.3) make appropriate changes as needed. (P.3)
23:59:59, 30 June 2017 +
23:59:59, 30 June 2017 +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +, 05000293/FIN-2017002-05 +...
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
19:06:02, 30 September 2017 +
23:59:59, 30 June 2017 +