Browse wiki

Jump to navigation Jump to search
A Severity Level IV, Cited Violation of 10A Severity Level IV, Cited Violation of 10 CFR 50.9(a) Completeness and Accuracy of Information, was identified by the inspectors for the licensees failure to maintain complete and accurate information required by the Commission. Specifically, a Point Beach Nuclear Plant employee and two contract employees from Day and Zimmermann Nuclear Power Services, signed Ignition Control Permits without the authorized person inspecting the areas as required by the ignition control procedure NP 1.9.13. The violation affected the NRCs ability to perform its regulatory function because it involved willfulness. Therefore, it was evaluated using Traditional Enforcement. The NRC determined that a Severity Level IV violation was appropriate due to the willful nature of some violation examples. The NRC determined that the violation should be cited because: (1) the violation was NRC-identified; and (2) it was willful; and (3) it involved a first-line supervisor.d (3) it involved a first-line supervisor.  +
23:59:59, 31 March 2010  +
05000266  +  and 05000301  +
23:59:59, 31 March 2010  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
17:22:41, 1 October 2017  +
23:59:59, 31 March 2010  +
Inaccurate Information Relating to Signatures on Ignition Control Procedures  +