Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000271/201400427 October 2014IR 05000271-14-004; 07/01/2014 - 09/30/2014; Vermont Yankee Nuclear Power Station; Equipment Alignment, Plant Modifications, and Problem Identification and Resolution
ML1102002431 November 2010Final Written Examination with Answer Key (401-5 Format)
ML1101105196 October 2010Draft Written Exam (Folder 2)
ML0603901072 March 2006Vermont Yankee, Tech Spec Pages for Amendment 229 Regarding Extended Power Uprate
ML07068017325 January 2006LRPD-03, Revision 0; TLAA and Exemption Evaluation Results, 01/25/2006
ML07058023625 January 2006LRPD-03, Rev. 0, TLAA Exemption Evaluation Results.
BVY 06-001, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications10 January 2006Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications
IR 05000271/20040023 May 2004IR 05000271-04-002, on 01/01/2004 - 03/31/2004, Vermont Yankee Nuclear Power Station, Vernon, VT; Event Followup
ML20129A70811 September 1996Proposed Tech Specs,Modifying Sections 2.2.B & 3.6.D.1 of Util & Accompanying Bases Section to Permit Operation W/ Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power W/Single Inoperable SRV
ML20070K41819 July 1994Reformatted TSs Current Through Amend 137
ML20065R0214 May 1994Proposed Reformatted TSs
ML20056C72214 July 1993Proposed Tech Specs Sections 3.6 & 4.6 for Compliance W/Gl 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping
BVY-93-068, Proposed Change 171 to License DPR-28,revising TS Sections 3.6 & 4.6 & Accompanying Bases Section to Comply W/Gl 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping14 July 1993Proposed Change 171 to License DPR-28,revising TS Sections 3.6 & 4.6 & Accompanying Bases Section to Comply W/Gl 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping
ML20247L75425 July 1989Responds to NRC 890524 Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in Austenitic Stainless Steel Piping
ML20247M89824 May 1989Forwards Request for Addl Info Re 880727 Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Response Should Be Sent to Viking Sys,Intl at Listed Address
IR 05000271/19890024 May 1989Insp Rept 50-271/89-02 on 890214-0417.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint, Surveillance & Engineering Support
IR 05000271/19880133 October 1988Insp Rept 50-271/88-13 on 880830-0901.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Conducted on 880831
IR 05000271/198701219 August 1987Insp Rept 50-271/87-12 on 870602-0730.Violation Noted.Major Areas Inspected:Physical Security,Plant Operations,Control Room Habitability Survey,Maint & Spent Fuel Pool Reracking Activities & Actions on Previous Insp Findings
ML20203P68022 April 1986Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl
FVY-85-121, Notifies of Compliance W/Order Confirming Licensee Commitments on Pipe crack-related Issues.Conditions Will Be Complied W/Upon Completion of Reactor Recirculation & RHR Sys Replacement Program13 December 1985Notifies of Compliance W/Order Confirming Licensee Commitments on Pipe crack-related Issues.Conditions Will Be Complied W/Upon Completion of Reactor Recirculation & RHR Sys Replacement Program
ML20093A58331 July 1983Technical Evaluation of Integrity of Vermont Yankee Nuclear Power Station Reactor Coolant Boundary Piping Sys