Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000271/2014004 | 27 October 2014 | IR 05000271-14-004; 07/01/2014 - 09/30/2014; Vermont Yankee Nuclear Power Station; Equipment Alignment, Plant Modifications, and Problem Identification and Resolution |
ML110200243 | 1 November 2010 | Final Written Examination with Answer Key (401-5 Format) |
ML110110519 | 6 October 2010 | Draft Written Exam (Folder 2) |
ML060390107 | 2 March 2006 | Vermont Yankee, Tech Spec Pages for Amendment 229 Regarding Extended Power Uprate |
ML070680173 | 25 January 2006 | LRPD-03, Revision 0; TLAA and Exemption Evaluation Results, 01/25/2006 |
ML070580236 | 25 January 2006 | LRPD-03, Rev. 0, TLAA Exemption Evaluation Results. |
BVY 06-001, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications | 10 January 2006 | Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications |
IR 05000271/2004002 | 3 May 2004 | IR 05000271-04-002, on 01/01/2004 - 03/31/2004, Vermont Yankee Nuclear Power Station, Vernon, VT; Event Followup |
ML20129A708 | 11 September 1996 | Proposed Tech Specs,Modifying Sections 2.2.B & 3.6.D.1 of Util & Accompanying Bases Section to Permit Operation W/ Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power W/Single Inoperable SRV |
ML20070K418 | 19 July 1994 | Reformatted TSs Current Through Amend 137 |
ML20065R021 | 4 May 1994 | Proposed Reformatted TSs |
ML20056C722 | 14 July 1993 | Proposed Tech Specs Sections 3.6 & 4.6 for Compliance W/Gl 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping |
BVY-93-068, Proposed Change 171 to License DPR-28,revising TS Sections 3.6 & 4.6 & Accompanying Bases Section to Comply W/Gl 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping | 14 July 1993 | Proposed Change 171 to License DPR-28,revising TS Sections 3.6 & 4.6 & Accompanying Bases Section to Comply W/Gl 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping |
ML20247L754 | 25 July 1989 | Responds to NRC 890524 Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in Austenitic Stainless Steel Piping |
ML20247M898 | 24 May 1989 | Forwards Request for Addl Info Re 880727 Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Response Should Be Sent to Viking Sys,Intl at Listed Address |
IR 05000271/1989002 | 4 May 1989 | Insp Rept 50-271/89-02 on 890214-0417.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint, Surveillance & Engineering Support |
IR 05000271/1988013 | 3 October 1988 | Insp Rept 50-271/88-13 on 880830-0901.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Conducted on 880831 |
IR 05000271/1987012 | 19 August 1987 | Insp Rept 50-271/87-12 on 870602-0730.Violation Noted.Major Areas Inspected:Physical Security,Plant Operations,Control Room Habitability Survey,Maint & Spent Fuel Pool Reracking Activities & Actions on Previous Insp Findings |
ML20203P680 | 22 April 1986 | Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl |
FVY-85-121, Notifies of Compliance W/Order Confirming Licensee Commitments on Pipe crack-related Issues.Conditions Will Be Complied W/Upon Completion of Reactor Recirculation & RHR Sys Replacement Program | 13 December 1985 | Notifies of Compliance W/Order Confirming Licensee Commitments on Pipe crack-related Issues.Conditions Will Be Complied W/Upon Completion of Reactor Recirculation & RHR Sys Replacement Program |
ML20093A583 | 31 July 1983 | Technical Evaluation of Integrity of Vermont Yankee Nuclear Power Station Reactor Coolant Boundary Piping Sys |