Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1
ML21347A03813 January 2022Issuance of Amendments to Revise Reactor Coolant Leakage Requirements
ML21277A19316 November 2021Enclosure 2, Draft Conforming License Amendments
RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements30 June 2021Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments25 March 2021Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments
ML20339A01320 November 20209 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8
ML20339A02520 November 20209 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5
ML20339A22120 November 2020Technical Specifications Bases, Rev 101
ML20034G54612 March 2020Issuance of Amendments Revising Instrument Testing and Calibration Definitions
ML19150A46510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8
ML19150A47810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5
ML19150A51110 May 2019Revision 90 to Technical Specification Bases
ML18117A01019 April 2018Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis
ML17073A06726 May 2017Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256)
ML17104A2013 March 2017Final Operating Test (Sections a, B, and C) (Folder 3)
ML17114A43719 January 2017Draft Operating Exam (Section a, Section B, Section C) (Folder 2)
ML16280A4026 October 2016License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.
ML16209A21826 July 2016Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.
ML16180A1565 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML16180A1645 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML15166A0754 June 2015Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)
ML12356A37618 October 2012Draft Operating Exam (Sections a, B, and C) Folder 2)
ML12332A1101 October 2012Final Operating Exam (Sections a, B, and C) (Folder 3)
ML09210030210 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 7, Instrumentation and Controls Through Chapter 10, Steam and Power Conversion System
ML09210030110 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 4, Reactor Through Chapter 6, Engineered Safety Features
ML0519501237 July 2005License Amendment Request Regarding Extended Power Uprate
ML04133014823 January 2004Issuance of Renewed Facility Operating License No. DPR-18 for R. E. Ginna Nuclear Power Plant, Technical Specification (Appendix a)
ML03276052122 September 20032 to EPIP-1-0, Revision 32 to EAL Technical Basis, Revision 56 to EPIP 1-5, Revision 6 to EPIP 2-8, and Revision 8 to EPIP 2-17
ML03150052921 May 2003License Amendment Request Re Revision of Technical Specification Sections 1.1, 3.3.6, 3.4.16, 3.6.6, 3.7.9, 5.5.10, 5.5.16 and 5.6.7 Resulting from Modification of Control Room Emergency Air Treatment System, Attachments 4 Through 10
ML03085003520 March 2003Revision to Emergency Plan Implementing Procedures
ML02141028915 May 2002Transmittal of Ginna Station Emergency Action Level (EAL) Technical Basis, Rev. 028
ML17265A29421 May 1998Tech Specs Consisting of Submittal Changes for 1998
ML17263A83311 October 1994Rev 1 to Re Ginna EALs Technical Bases.
ML18041A0296 July 1994Forwards Emergency Action Level Verification & Validation Rept.
ML17311A01813 May 1994New York State EAL Upgrade Project Verification & Validation Rept.
ML17254A72921 January 1986Rev to 831110 Proposed Tech Specs,Providing Clarification of Term Operable & Consistency Between Limiting Conditions for Operation & Associated Action Statements,Per NRC Comments