Issue date | Title | |
---|---|---|
ML22038A164 | 1 February 2022 | Technical Specification Bases, Revision 83 |
ML20226A429 | 3 August 2020 | Technical Specifications Bases, Revision 78 |
ML13071A391 | 21 February 2013 | Technical Specifications Bases |
CP-201300130, Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67 | 4 February 2013 | Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67 |
ML13043A039 | 4 February 2013 | Technical Specification Bases, Revision 67 |
CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled | 1 August 2011 | License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled |
ML092950551 | 26 February 2010 | Issuance of Amendment Nos. 150 and 150, Administrative Revision to the Operating License to Change Plant Name, Reissue Technical Specifications to Remove Ts/Tables No Longer Applicable to Operation |
ML101170367 | 15 February 2010 | Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2 |
CP-201000212, Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2 | 15 February 2010 | Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2 |
CP-200900262, License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications | 11 February 2009 | License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications |
IR 05000445/2008003 | 4 August 2008 | IR 05000445-08-003, 05000446-08-003; 03/24/2008-06/22/2008; Comanche Peak Steam Electric Station, Units 1 and 2: Integrated Resident and Regional Report; Fire Protection, Maintenance Rule Implementation, Access Control to Radiologically Sig |
CP-200801015, Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 | 1 August 2008 | Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 |
ML082321278 | 1 August 2008 | Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 |
ML072490358 | 31 August 2007 | WCAP-16840-NP, Rev. 0, Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report, Page 2.8.1-1 to End |
CPSES-200600635, License Amendment Request (LAR) 06-004 Revision to Technical Specification 5.0, Administrative Controls. | 31 March 2006 | License Amendment Request (LAR) 06-004 Revision to Technical Specification 5.0, Administrative Controls. |
ML023570388 | 4 January 2002 | CP - Init Exam -11/2002 - Draft Exam |
ML20195H922 | 17 November 1998 | Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution |
ML20249C610 | 22 June 1998 | Proposed Tech Specs Section 3.6 Re Conversion Application |
IR 05000445/1992054 | 27 January 1993 | Insp Repts 50-445/92-54 & 50-446/92-54 on 921214-23.No Violations Noted.Major Areas Inspected:Units 1 & 2 Programs for Liquid & Gaseous Radwaste Mgt,Radiological Environ Monitoring Program & Solid Radwaste Sys |
ML20246M934 | 17 March 1989 | Forwards for Review,Final Draft Tech Specs for Unit 1 & Requests Certification by 890414 That Final Draft Accurately Reflects as-built Plant & FSAR |
ML20206G039 | 16 November 1988 | Forwards Util Proposed Changes to NRC Second Draft Tech Specs as Part of Ongoing Tech Spec Development Effort,Per 881019 Meeting W/Nrc |
ML20154Q216 | 1 June 1988 | Forwards Detailed Listing & Description of Every Change to FSAR That Causes Document to Differ from Version Reviewed & Accepted by NRC Through Sser 12 |
ML20147E616 | 2 March 1988 | Forwards Draft Tech Spec Prepared from 871203 Draft & Supplemented by Info from NRC 880110 Meeting W/Util. Preparation of Proof & Review Scheduled to Begin on 880321 & Issuance of Proof & Review Expected by 880404 |
ML20151Z512 | 23 February 1988 | Forwards Typed Version of Second Draft of Facility Tech Specs |
ML20237J699 | 14 August 1987 | Forwards NRC Draft STS for four-loop Westinghouse Plants & Should Be Considered by Util in Developing plant-specific Tech Specs for Facility,Per 870805 Meeting.Final Tech Specs Will Be Issued W/Ol |