Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000397/202200228 July 2022and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000397/2022002 and 07200035/2022001
ML21349B38415 December 2021Attachment 5: Columbia Generating Station FSAR, Amendment 66, Part 5 of 10
ML21098A1704 March 2021CG-2021-02-FINAL Written Examination
ML21113A0054 March 2021CG-2021-02-DRAFT Written Exam
ML17355A66731 December 2017Amendment 64 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML17355A66331 December 2017Amendment 64 to Final Safety Analysis Report, Chapter 4, Reactor
ML17355A66131 December 2017Amendment 64 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML17355A65621 December 2017Technical Specification Bases
IR 05000397/201700210 August 2017NRC Integrated Inspection Report 05000397/2017002
ML15355A50921 December 2015Final Safety Analysis Report, Amendment 63, Chapter 9 - Auxiliary Systems
ML15355A50721 December 2015Final Safety Analysis Report, Amendment 63, Chapter 7 - Instrumentation and Control Systems
ML15355A48921 December 2015Final Safety Analysis Report, Amendment 63, Chapter 1 - Introduction and General Description of Plant
GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 317 March 2015License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3
IR 05000397/20140027 May 2014IR 05000397-14-002; 01/01/2014 - 03/23/2014; Columbia Generating Station; Adverse Weather Protection, Operability Determinations and Functionality Assessments
ML14010A30030 December 2013Final Safety Analysis Report, Amendment 62, Chapter 5 - Reactor Coolant System and Connected Systems
ML14010A29330 December 2013Final Safety Analysis Report, Amendment 62, Chapter 1 - Introduction and General Description of Plant
ML14010A30230 December 2013Final Safety Analysis Report, Amendment 62, Chapter 7 - Instrumentation and Control Systems
ML14010A30430 December 2013Final Safety Analysis Report, Amendment 62, Chapter 9 - Auxiliary Systems
ML12089A04322 May 2012Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station. Columbia Lr Ltr to Applicant
GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License9 January 2012License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License
ML12011A16314 December 2011Amendment 61 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML12011A16114 December 2011Amendment 61 to Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML12011A15914 December 2011Amendment 61 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML12011A15214 December 2011Amendment 61 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML11159A1441 June 2011Response to Request for Additional Information Regarding Emergency Action Level Scheme Change
GO2-10-121, Emergency Action Level Scheme Change to NEI 99-01, Rev. 5 Format25 August 2010Emergency Action Level Scheme Change to NEI 99-01, Rev. 5 Format
IR 05000397/20050047 November 2005IR 05000397-05-004 on 06/24/05 - 09/23/05; Columbia Generating Station; Post Maintenance Testing, Other Activities
IR 05000397/200400514 February 2005IR 05000397-04-005 on 12/31/2004 for Columbia Generating Station, Adverse Weather Protection, Personnel Performance During Nonroutine Evolutions, Surveillance Testing and Other
ML14357A3855 April 20044.5.04 - Transmittal of Revision 38 to the Columbia Generating Station Emergency Plan
ML03314034623 October 2003Plant Procedures Manual - Volume 13, Package No. 2003-738
ML0312700262 May 2003Plant Procedures Manual - Volume 13, Emergency Plan Implementing Procedures, Table of Contents Through Table 6
IR 05000397/200200623 January 2003IR 05000397-02-006, on 12/2-12/10/2002, Energy Northwest, Columbia Generating Station, Supplemental Inspection for a White Finding and Baseline Inspection of the Identification and Resolution of Problems; Other
ML0220300192 July 2002Revised Emergency Plan Implementing Procedures, Including Rev 10 to 13.1.1A, Classifying Emergency - Technical Bases & Rev 16 to 13.5.1, Localized & Protected Area Evacuations.
ML02142003010 May 2002Part 1 of 2, Columbia Generating Station - Revised Plant Procedures Manual - Volume 13
ML17292B42013 July 1998Forwards Rev 20 to WNP-2 Emergency Plan IAW 10CFR50.4(b), 50.54(q) & 10CFR50,App E.Detailed Synopsis of Changes,Encl. Changes Do Not Reduce Effectiveness of Plan
ML20203G0291 July 1998Forwards Proposed Exam Outlines,Checklist & Security Agreement for SRO & RO License Exams Scheduled for Week of 981102 at WNP-2
ML17292B26131 December 1997WNP-2 Annual Operating Rept for 1997. W/980226 Ltr
ML17292A76224 March 1997Rev 5 to TS Bases.
ML17292A65714 January 1997Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl
ML17292A65914 January 1997Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212
ML17292A4506 September 1996Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations
ML17292A3569 July 1996Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a
ML17291A44613 October 1994Forwards WNP-2 Response to Request for Addl Info on Emergency Classification.
ML17286B02120 August 1991Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Reflecting Causes of Operators Continued Inability to Respond to Severe Accident Conditions
ML17285A31331 December 1988Annual Operating Rept 1988. W/890228 Ltr
ML17277A97431 October 1983Forwards Addl Info Re Emergency Classification Sys & Emergency Action Levels,Per NRC 831005 Request.Due to Plant Design,Not Possible to Quantify Primary Coolant Leakage in Excess of Tech Spec Limits
ML17277A6761 July 1983Forwards Rept on Safety Parameter Display Sys Safety Analysis,Per 830415 Commitment & Response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability.
ML17276B0825 February 1982Forwards Amend 21 to Fsar.Affidavit Will Be Furnished within 10 Days of Filing to Reflect Distribution of Amend,Per 10CFR2.101
ML17275B2304 September 1981Forwards Responses to Containment Sys Branch 810316 Request for Addl Info.Responses Will Be Incorporated Into FSAR Amend within 4 Months.Remainder of Responses Re Hydrogen Recombiner Will Be Submitted to NRC by 810918
ML17272A40323 March 1979Forwards Amend 3 to FSAR