Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22340A15030 November 20221 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary
AEP-NRC-2021-19, 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary19 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
IR 05000315/20180104 September 2018NRC Design Basis Assurance (Teams); Inspection Report 05000315/2018010; 05000316/2018010 (DRS-J.Bozga)
IR 05000315/201200711 January 2013IR 05000315-12-007, 05000316-12-007(DRS), 07/23/2012 Through 12/31/2012, D.C. Cook Nuclear Power Plant, Units 1 and 2, Component Design Bases Inspection (CDBI)
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls