ML22111A207 | 31 March 2022 | 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20105A260 | 31 March 2020 | 1 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
RS-17-076, License Amendment Request to Revise Spent Fuel Pool Level | 18 July 2017 | License Amendment Request to Revise Spent Fuel Pool Level |
ML15342A354 | 8 December 2015 | License Amendment Request Extension of Secondary Containment - NRC Pre- Application Meeting December 9, 2015 |
RS-15-260, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time | 30 September 2015 | Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time |
IR 05000461/2015002 | 4 August 2015 | IR 05000461/2015002; on 04/01/2015-06/30/2015; Clinton Power Station, Unit 1; Integrated, Post Maintenance Testing, Occupational Dose Assessment, and Identification and Resolution of Problems |
ML15029A719 | 29 January 2015 | IR 05000461/2014005; on 10/01/14 - 12/31/14; Clinton Power Station; Adverse Weather Protection, Identification and Resolution of Problems, and Follow-Up of Events and Notices of Enforcement Discretion |
RS-14-009, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) | 28 February 2014 | Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems | 9 January 2014 | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems |
ML14015A098 | 9 January 2014 | Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems |
ML13016A315 | 10 January 2013 | Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems | 10 January 2013 | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems |
ML11237A007 | 25 August 2011 | FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 |
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 | 25 August 2011 | FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 |
ML082590018 | 30 September 2008 | Audit of the Licensee'S Management of Regulatory Commitments |
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included | 8 October 1999 | Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included |
05000461/LER-1997-032, Forwards LER 97-032-00,plant Was Outside Design Basis Due to Inadequate Tornado Missile Protection Caused by Design Error,Iaw 10CFR50.73 & 10CFR21.21.Commitments Made in Rept, Listed | 2 January 1998 | Forwards LER 97-032-00,plant Was Outside Design Basis Due to Inadequate Tornado Missile Protection Caused by Design Error,Iaw 10CFR50.73 & 10CFR21.21.Commitments Made in Rept, Listed |
IR 05000461/1988030 | 15 February 1989 | Safety Insp Rept 50-461/88-30 on 881206-890127.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Info Notices & Preparation for Refueling & Refueling Activities |
ML20212H541 | 3 March 1987 | Notice of Violation from Insp on 860701-1010 & Proposed Imposition of Civil Penalty in Amount of $75,000.Violations Noted:Design Control Measures Did Not Ensure That Design Bases for Structures & Sys Correctly Translated Into Specs |
IR 05000461/1986048 | 21 August 1986 | Insp Rept 50-461/86-48 on 860701-28.Violation & Deviation Noted:Failure of Plant Maint Technicians to Pay Attention to Details of Work & Safety Evaluation Ineffective in Assuring FSAR Commitments Met,Respectively |
NUREG-0853, Forwards Suppl 6 to NUREG-0853, SER Re Operation of Clinton Power Station,Unit 1 | 12 August 1986 | Forwards Suppl 6 to NUREG-0853, SER Re Operation of Clinton Power Station,Unit 1 |
ML19348A011 | 26 May 1981 | Forwards Supporting Info on Clinton FSAR Consisting of Responses to NRC Round 1 Questions Raised on Grand Gulf Fsar.Appropriate Text Page Changes Applicable to Clinton Station Are Provided in FSAR Amend 3,Apr 1981 |