Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22111A20731 March 20222 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20105A26031 March 20201 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems
RS-17-076, License Amendment Request to Revise Spent Fuel Pool Level18 July 2017License Amendment Request to Revise Spent Fuel Pool Level
ML15342A3548 December 2015License Amendment Request Extension of Secondary Containment - NRC Pre- Application Meeting December 9, 2015
RS-15-260, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time30 September 2015Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time
IR 05000461/20150024 August 2015IR 05000461/2015002; on 04/01/2015-06/30/2015; Clinton Power Station, Unit 1; Integrated, Post Maintenance Testing, Occupational Dose Assessment, and Identification and Resolution of Problems
ML15029A71929 January 2015IR 05000461/2014005; on 10/01/14 - 12/31/14; Clinton Power Station; Adverse Weather Protection, Identification and Resolution of Problems, and Follow-Up of Events and Notices of Enforcement Discretion
RS-14-009, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049)28 February 2014Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049)
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems
ML14015A0989 January 2014Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems
ML13016A31510 January 2013Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems10 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems
ML11237A00725 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/1125 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML08259001830 September 2008Audit of the Licensee'S Management of Regulatory Commitments
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included8 October 1999Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included
05000461/LER-1997-032, Forwards LER 97-032-00,plant Was Outside Design Basis Due to Inadequate Tornado Missile Protection Caused by Design Error,Iaw 10CFR50.73 & 10CFR21.21.Commitments Made in Rept, Listed2 January 1998Forwards LER 97-032-00,plant Was Outside Design Basis Due to Inadequate Tornado Missile Protection Caused by Design Error,Iaw 10CFR50.73 & 10CFR21.21.Commitments Made in Rept, Listed
IR 05000461/198803015 February 1989Safety Insp Rept 50-461/88-30 on 881206-890127.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Info Notices & Preparation for Refueling & Refueling Activities
ML20212H5413 March 1987Notice of Violation from Insp on 860701-1010 & Proposed Imposition of Civil Penalty in Amount of $75,000.Violations Noted:Design Control Measures Did Not Ensure That Design Bases for Structures & Sys Correctly Translated Into Specs
IR 05000461/198604821 August 1986Insp Rept 50-461/86-48 on 860701-28.Violation & Deviation Noted:Failure of Plant Maint Technicians to Pay Attention to Details of Work & Safety Evaluation Ineffective in Assuring FSAR Commitments Met,Respectively
NUREG-0853, Forwards Suppl 6 to NUREG-0853, SER Re Operation of Clinton Power Station,Unit 112 August 1986Forwards Suppl 6 to NUREG-0853, SER Re Operation of Clinton Power Station,Unit 1
ML19348A01126 May 1981Forwards Supporting Info on Clinton FSAR Consisting of Responses to NRC Round 1 Questions Raised on Grand Gulf Fsar.Appropriate Text Page Changes Applicable to Clinton Station Are Provided in FSAR Amend 3,Apr 1981