Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule |
IR 05000250/2023010 | 29 September 2023 | Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 |
ML23151A443 | 24 May 2023 | Enclosure 2, Volume 5: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3, LCO and SR Applicability, Revision 2 |
ML23151A449 | 24 May 2023 | Enclosure 2, Volume 11:Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 3 |
ML23095A008 | 4 April 2023 | Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database |
ML23095A013 | 4 April 2023 | Enclosure 2 - ITS Section 3.0 LCO and SR Applicability, Revision 2, Volume 5 |
ML23095A018 | 4 April 2023 | Enclosure 2 - ITS Section 3.6 Containment Systems, Revision 2, Volume 11 |
ML22089A203 | 30 March 2022 | Enclosure 2 - Volume 5, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.0 LCO and SR Applicability, Revision 1 |
ML22089A209 | 30 March 2022 | Enclosure 2 - Volume 11, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.6 Containment Systems, Revision 1 |
ML21265A382 | 22 September 2021 | Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment Systems |
ML21265A376 | 22 September 2021 | Improved Technical Specifications Conversion, Volume 5, Revision 0, Section 3.0, LCO and SR Applicability |
ML21265A383 | 22 September 2021 | Improved Technical Specifications Conversion, Volume 12, Revision 0, Section 3.7, Plant Systems |
L-2021-096, 10 CFR 50.59(d)(2) Summary Report | 11 May 2021 | 10 CFR 50.59(d)(2) Summary Report |
ML21123A303 | 3 May 2021 | 301 Exam Report Items - SRO as Given Written Exam |
L-2020-157, Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 5 November 2020 | Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | 8 June 2020 | Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor |
L-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | 6 December 2019 | License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. |
L-2019-188, CFR 50.59(d)(2) Summary Report of Changes, Test and Experiments October 29, 2017 to April 11, 2019 | 7 October 2019 | CFR 50.59(d)(2) Summary Report of Changes, Test and Experiments October 29, 2017 to April 11, 2019 |
ML19148A744 | 31 July 2019 | Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 |
ML18130A466 | 12 June 2018 | Amendments Regarding Technical Specifications Pertaining to IST Program and ISI Program Requirements and Surveillance Frequency Control Program Applicability |
L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications | 29 May 2018 | Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications |
L-2018-100, Submittal of 10 CFR 50.59(d)(2) Summary Report | 25 April 2018 | Submittal of 10 CFR 50.59(d)(2) Summary Report |
ML18150A482 | 23 April 2018 | NRR E-mail Capture - (External_Sender) LCO 3.0.6 LAR Pre-submittal Call |
ML17088A319 | 12 April 2018 | COL Appendix B, EPP |
ML17088A300 | 12 April 2018 | COL Appendix a, Tech Specs |
ML17088A301 | 12 April 2018 | COL Appendix B, EPP |
ML17088A314 | 12 April 2018 | COL Appendix a, Tech Specs |
ML18018A559 | 20 February 2018 | Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) |
IR 05000250/2017004 | 8 February 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000250/2017004 and 05000251/2017004 |
ML17320A648 | 5 December 2017 | Revised Draft - Combined License for Turkey Point Unit 7 |
ML17320A640 | 5 December 2017 | Revised Draft - Combined License for Turkey Point Unit 6 |
ML20311A340 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML20311A347 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
L-2017-100, License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ... | 28 June 2017 | License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ... |
ML17027A078 | 7 April 2017 | Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) |
ML16214A276 | 28 July 2016 | NextEra Energy Resources, LLC, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to t |
L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps | 30 June 2016 | Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps |
L-2016-128, License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps | 30 June 2016 | License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps |
IR 05000250/2015001 | 30 April 2015 | IR 05000250/2015001, 05000251/2015001; 01/01/2015 - 03/31/2015; Turkey Point Nuclear Plant, Units 3 & 4; Event Follow-up |
ML15119A478 | 29 April 2015 | Initial Exam 2015-301 Draft SRO Written Examination |
IR 05000250/2015007 | 17 March 2015 | IR 05000250/2015007 and 05000251/2015007, January 26, 2015, to February 6, 2015, Turkey Point, Units 3 & 4, NRC Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications |
L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 | 13 February 2015 | Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 |
ML120580532 | 27 February 2012 | Public Meeting Summary - Turkey Point - Meeting Slides |
IR 05000250/2011005 | 26 January 2012 | IR 05000250-11-005, IR 05000251-11-005; 10/1/2011 - 12/31/2011; Turkey Point Nuclear Power Plant, Units 3 and 4; Problem Identification and Resolution |
ML110830895 | 22 April 2011 | Safety Evaluation for Relief Request No. 8 Regarding Repair of Spent Fuel Pool Transfer Canal Drain Piping |
ML103070073 | 21 October 2010 | Relief Request No. 8, Transfer Canal Drain Line Piping Repairs |
IR 05000250/2010501 | 28 April 2010 | |
IR 05000250/2010002 | 28 April 2010 | IR 05000250-10-002 and 05000251-10-002, on 01/01 - 03/31/2010, Turkey Point, Units 3 & 4, Integrated Inspection Report, Plant Modifications |
ML093010111 | 28 October 2009 | 302 Initial Licensing Examination (RO & SRO) |
L-2009-155, LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV | 2 July 2009 | LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV |