Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML18018B112 | 18 January 2018 | Scram Summary 91-01 Relating to an Event on August 13, 1991 Concerning a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal Fault |
ML17037B432 | 6 February 2017 | Drawing 12177-EE-1F-6, 13.8K V One Line Diagram Normal Bus 2NPS-SWG001 - Nine Mile Point Nuclear Station - Unit 2. |
ML16085A262 | 30 November 2015 | Draft Operating Exam (Sections a, B, and C) (Folder 2) |
ML091610105 | 31 May 2009 | NEDO-33351, Rev. 0, Safety Analysis Report for Nine Mile Point Nuclear Station, Unit 2 Constant Pressure Power Uprate (Pusar), Attachment 3, Part 2 of 2 and Attachments 4 - 10 and 12 & 13 |
ML20211K507 | 6 July 1999 | Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 |
IR 05000220/1999004 | 21 June 1999 | Insp Repts 50-220/99-04 & 50-410/99-04 on 990328-0508.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support |