Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23303A13627 October 2023Enclosure C - Pnpp Technical Specification Bases, Revision 18
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 October 2022Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position5 August 2022Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
ML21361A19720 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant Systems and Connected Systems
ML21361A19820 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 15, Accident Analysis
ML21361A20320 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 4, Reactor
ML21361A20620 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 14, Initial Test Program
ML21361A20920 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21361A21320 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML21361A21720 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases
ML21361A21820 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features
ML21361A22620 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls Systems
ML21307A18528 October 20212 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML21307A18628 October 20212 to Updated Safety Analysis Report, Chapter 15, Accident Analyses
ML21307A19128 October 20212 to Updated Safety Analysis Report, Chapter 4, Reactor
ML21307A19428 October 20212 to Updated Safety Analysis Report, Chapter 14, Initial Test Program
ML21307A19828 October 20212 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21307A20228 October 20212 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML21307A20728 October 20212 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases
ML21307A20828 October 20212 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features
ML21307A21628 October 20212 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls Systems
L-20-169, Request for Licensing Action to Revise the Technical Specifications14 December 2020Request for Licensing Action to Revise the Technical Specifications
L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements24 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
ML20156A1284 June 2020Final ASP Analysis - Perry (LER 440-87-012)
ML20099A10222 May 2020Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR
L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR18 December 2019Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR
ML18292A81612 December 2018Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control
IR 05000440/20170083 January 2018NRC Design Bases Assurance Inspection (Teams) Inspections Report 05000440/2017008 (DRS-N.Feliz-Adorno)
IR 05000440/20170029 August 2017NRC Integrated Inspection Report 05000440/2017002 and Exercise of Enforcement Discretion
ML17139C37219 June 2017Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179)
ML17096A7445 April 20172017 Perry Nuclear Power Plant Initial Licensed Operator Examination Administered Written Examinations
ML17158B4353 February 20172017 Perry Nuclear Power Plant Initial Licensed Operator Examination Written Exam Outline ES-401-1 and 3 - Updated
ML17158B4653 February 20172017 Perry Nuclear Power Plant Initial Licensed Operator Examination Written Exam Outline ES-401-1 and 3
ML17164A0633 February 20172017 Perry Nuclear Power Plant Initial Licensed Operator Examination Proposed Written Exam - RO and SRO Combined
L-16-179, License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits.1 November 2016License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits.
IR 05000440/201600113 May 2016NRC Integrated Inspection Report 05000440/2016001
L-16-083, License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 315 March 2016License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3
ML15075A13930 March 2015Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306)
ML15075A09127 March 2015Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)
L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)27 March 2015Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)
L-14-106, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b25 March 2014License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b
ML13051B1446 May 2013Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300
L-12-318, License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 05 September 2012License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0
L-12-261, Request for Licensing Action to Modify Technical Specification 3.8.1, AC Sources - Operating, to Remove Mode Restrictions on Certain Division 3 Surveillance Requirements3 July 2012Request for Licensing Action to Modify Technical Specification 3.8.1, AC Sources - Operating, to Remove Mode Restrictions on Certain Division 3 Surveillance Requirements
ML11077031518 April 2011License Amendment, Issuance of Amendment License Amendment to Modify Technical Specification 2.1.1, Reactor Core Sls to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values
IR 05000440/20100051 February 2011IR 05000440-10-005, on 10/01/2010 - 12/31/2010, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Surveillance Testing, and Problem Identification and Resolution
ML10298044621 October 2010License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values
ML10217019318 July 20102010 Perry Plant Initial License Examination Proposed Written Examination
ML10217019721 June 20102010 Perry Plant Initial License Examination Administered Written Examination
L-09-218, Submittal of Technical Specification Bases, Revision 75 October 2009Submittal of Technical Specification Bases, Revision 7