Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23303A136 | 27 October 2023 | Enclosure C - Pnpp Technical Specification Bases, Revision 18 |
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 October 2022 | Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 5 August 2022 | Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
ML21361A197 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant Systems and Connected Systems |
ML21361A198 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 15, Accident Analysis |
ML21361A203 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 4, Reactor |
ML21361A206 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 14, Initial Test Program |
ML21361A209 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21361A213 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML21361A217 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases |
ML21361A218 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML21361A226 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls Systems |
ML21307A185 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21307A186 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 15, Accident Analyses |
ML21307A191 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 4, Reactor |
ML21307A194 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program |
ML21307A198 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21307A202 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML21307A207 | 28 October 2021 | 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases |
ML21307A208 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML21307A216 | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls Systems |
L-20-169, Request for Licensing Action to Revise the Technical Specifications | 14 December 2020 | Request for Licensing Action to Revise the Technical Specifications |
L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 24 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
ML20156A128 | 4 June 2020 | Final ASP Analysis - Perry (LER 440-87-012) |
ML20099A102 | 22 May 2020 | Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR |
L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR | 18 December 2019 | Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR |
ML18292A816 | 12 December 2018 | Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control |
IR 05000440/2017008 | 3 January 2018 | NRC Design Bases Assurance Inspection (Teams) Inspections Report 05000440/2017008 (DRS-N.Feliz-Adorno) |
IR 05000440/2017002 | 9 August 2017 | NRC Integrated Inspection Report 05000440/2017002 and Exercise of Enforcement Discretion |
ML17139C372 | 19 June 2017 | Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) |
ML17096A744 | 5 April 2017 | 2017 Perry Nuclear Power Plant Initial Licensed Operator Examination Administered Written Examinations |
ML17158B435 | 3 February 2017 | 2017 Perry Nuclear Power Plant Initial Licensed Operator Examination Written Exam Outline ES-401-1 and 3 - Updated |
ML17158B465 | 3 February 2017 | 2017 Perry Nuclear Power Plant Initial Licensed Operator Examination Written Exam Outline ES-401-1 and 3 |
ML17164A063 | 3 February 2017 | 2017 Perry Nuclear Power Plant Initial Licensed Operator Examination Proposed Written Exam - RO and SRO Combined |
L-16-179, License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits. | 1 November 2016 | License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits. |
IR 05000440/2016001 | 13 May 2016 | NRC Integrated Inspection Report 05000440/2016001 |
L-16-083, License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 | 15 March 2016 | License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 |
ML15075A139 | 30 March 2015 | Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306) |
ML15075A091 | 27 March 2015 | Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) |
L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) | 27 March 2015 | Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) |
L-14-106, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b | 25 March 2014 | License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b |
ML13051B144 | 6 May 2013 | Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300 |
L-12-318, License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0 | 5 September 2012 | License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0 |
L-12-261, Request for Licensing Action to Modify Technical Specification 3.8.1, AC Sources - Operating, to Remove Mode Restrictions on Certain Division 3 Surveillance Requirements | 3 July 2012 | Request for Licensing Action to Modify Technical Specification 3.8.1, AC Sources - Operating, to Remove Mode Restrictions on Certain Division 3 Surveillance Requirements |
ML110770315 | 18 April 2011 | License Amendment, Issuance of Amendment License Amendment to Modify Technical Specification 2.1.1, Reactor Core Sls to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values |
IR 05000440/2010005 | 1 February 2011 | IR 05000440-10-005, on 10/01/2010 - 12/31/2010, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Surveillance Testing, and Problem Identification and Resolution |
ML102980446 | 21 October 2010 | License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values |
ML102170193 | 18 July 2010 | 2010 Perry Plant Initial License Examination Proposed Written Examination |
ML102170197 | 21 June 2010 | 2010 Perry Plant Initial License Examination Administered Written Examination |
L-09-218, Submittal of Technical Specification Bases, Revision 7 | 5 October 2009 | Submittal of Technical Specification Bases, Revision 7 |