Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23110A19310 April 20239 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents
ML23173A04010 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted
ML23173A02010 April 20239 to Updated Final Safety Analysis Report, Chapter 6, Core Standby Cooling Systems - Redacted
ML23173A01710 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted
ML23173A01510 April 20239 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Sections 1 Thru 10 - Redacted
ML23172A27010 April 20239 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System - Redacted
ML23110A25610 April 20239 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML23110A25310 April 20239 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 1 Thru 8
ML23110A24210 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of Contents
ML23110A22310 April 20239 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis
ML23062A4273 March 20238 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 9 (Redacted)
ML23062A2213 March 20238 to Updated Final Safety Analysis Report, Chapter 6, Sections 1 Through 7 (Redacted)
ML23062A2203 March 20238 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Through 23 (Redacted)
ML23062A2193 March 20238 to Updated Final Safety Analysis Report, Chapter 4, Sections 1 Through 11 (Redacted)
ML23062A2173 March 20238 to Updated Final Safety Analysis Report, Chapter 14, Sections 1 Through 10. (Redacted)
IR 05000277/20225018 June 2022Emergency Preparedness Biennial Exercise Inspection Report 05000277/2022501 and 05000278/2022501
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
ML21074A41114 May 2021Issuance of Amendment Nos. 338 and 341, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4B
ML21109A1038 April 20218 to Updated Final Safety Analysis Report, Chapter 13, Sections 1 Through 8
ML21109A0928 April 20218 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of Contents
ML21109A0428 April 20218 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents
ML21109A1068 April 20218 to Updated Final Safety Analysis Report, Chapter 1, Sections 1 Through 15
ML21109A0718 April 20218 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis
ML20337A3012 December 2020Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.
ML20184A24830 June 2020Final Written Examination with Answer Key (401-5 Format) (Folder 3)
ML20150A00729 May 2020License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML19176A03328 August 2019Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR
ML19114A1248 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary, Sections 1 Through 13
ML19114A2548 April 2019Revision 22 to Fire Protection Program, Appendix a - Tables
ML19114A2538 April 2019Revision 22 to Fire Protection Program, Chapter 5 Through 7
ML19114A1878 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis
ML19114A1628 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Sections 1 Thru 8
ML19114A1648 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents
ML19114A1448 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Through 23
ML19114A1438 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 9
ML19114A1428 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of Contents
ML19114A1408 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Sections 1 Though 7
ML19114A1658 April 2019Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis
ML19011A32526 February 2019Issuance of Amendment Nos. 323 and 326 to Revise Technical Specifications to Allow Continued Operation with Two Safety Relief Valves/Safety Valves Out of Service
RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.1 February 2019Application to Adopt TSTF-564, Safety Limit Mcpr.
ML18337A19629 November 2018Submittal of the Fifth Ten-Year Interval Inservice Testing Program Plan
ML18271A00927 September 2018License Amendment Request -Technical Specifications Section 3.3.6.2 Functions 3 and 4 Applicability Changes Pertaining to Reactor Building and Refueling Floor Ventilation
ML18150A38730 May 2018License Amendment Request - Revised Technical Specifications to Allow Two Safety Relief Valves / Safety Values to Be Out-of-Service with Increased Reactor Pressure Safety Limit
ML17325B70827 December 2017Issuance of Amendments Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542 (CAC Nos. MF9138 and MF9139; EPID L-2017-LLA-0174)
ML17354A38120 December 2017Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2
ML17286A01315 November 2017Issuance of Amendments Measurement Uncertainty Recapture Power Uprate (CAC Nos. MF9289 and MF9290; EPID L-2017-LLS-0001)
ML20311A4616 November 20172017 Q1-Q4 ROP Inspection Findings
ML20311A4556 November 20172017 Q1-Q4 ROP Inspection Findings
ML17223A62611 August 2017Response to Request for Additional Information Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2
ML17130A2086 April 2017Revision 26 to Updated Final Safety Analysis Report, Section 1.0 Introduction and Summary, Part 1 of 2