Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML24008A246 | 18 January 2024 | Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule |
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 8 November 2023 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual |
CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) | 7 August 2023 | License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) |
ML23178A083 | 10 July 2023 | Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs |
ML23150A247 | 25 May 2023 | NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods |
CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) | 4 May 2023 | Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) |
ML23116A149 | 21 April 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods |
WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR) | 10 April 2023 | Revised Pressure and Temperature Limits Report (PTLR) |
ML23072A065 | 5 April 2023 | Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 |
ML23052A036 | 22 February 2023 | February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides |
CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 | 4 January 2023 | Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 |
CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) | 27 July 2022 | Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) |
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 11 May 2022 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual |
CNL-22-005, Revision to Watts Bar Nuclear Plant, Unit 2, Reactor Vessel Surveillance Capsule Withdrawal Schedule | 24 January 2022 | Revision to Watts Bar Nuclear Plant, Unit 2, Reactor Vessel Surveillance Capsule Withdrawal Schedule |
WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR) | 9 December 2021 | Revised Pressure and Temperature Limits Report (PTLR) |
ML21148A100 | 17 June 2021 | Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology |
WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR) | 16 December 2020 | Revised Pressure and Temperature Limits Report (PTLR) |
CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) | 14 August 2020 | License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) |
CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) | 27 July 2020 | Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) |
ML20143A169 | 28 May 2020 | Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 |
ML20134J010 | 14 May 2020 | Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology |
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | 10 October 2019 | License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) |
ML18347B330 | 22 May 2019 | Issuance of Amendment Regarding Revision to Watts Bar Unit 2 Technical Specification 4.2.1 Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage |
L-19-026, Revised Pressure and Temperature Limits Report (PTLR) | 4 April 2019 | Revised Pressure and Temperature Limits Report (PTLR) |
L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual | 19 March 2019 | Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual |
CNL-18-067, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) | 12 October 2018 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) |
ML18180A218 | 5 July 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 |
ML18040A434 | 9 February 2018 | Submittal of Revised Limits Report (PTLR) Pressure and Temperature |
ML17353A192 | 21 December 2017 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 |
NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 | 21 December 2017 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 |
ML17312A260 | 20 November 2017 | Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule |
ML17313A128 | 9 November 2017 | Revised Pressure and Temperature Limits Report (PTLR) |
ML17306A802 | 2 November 2017 | Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual |
ML17334A170 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System |
CNL-17-112, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | 5 September 2017 | Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule |
ML16215A227 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 |
NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 |
ML16113A077 | 22 April 2016 | Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual |
ML15282A051 | 31 October 2015 | NUREG-0847, Supp. 29, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority. |
ML15251A587 | 22 October 2015 | Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant, Unit 2 |
ML15301A140 | 22 October 2015 | Current Facility Operating License NPF-96, Tech Specs, Revised 11/08/2017 |
ML15279A272 | 11 September 2015 | Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System | 11 September 2015 | Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System |
ML15229A195 | 31 August 2015 | NUREG-0847, Supplement 28 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 Docket Number 50-391 Tennessee Valley Authority |
IR 05000391/2015605 | 14 August 2015 | IR 05000391/2015605, May 17, 2015 June 30, 2015, Watts Bar Nuclear Plant, Unit 2, Integrated Report |
IR 05000390/2015605 | 14 August 2015 | IR 05000391/2015605, May 17, 2015 June 30, 2015, Watts Bar Nuclear Plant, Unit 2, Integrated Report |
CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 | 27 July 2015 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13 |
ML15033A041 | 31 January 2015 | NUREG-0847 Supplement 27, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2. |
ML14307A981 | 3 November 2014 | Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual |
CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12 | 2 September 2014 | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12 |