Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML24008A24618 January 2024Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual8 November 2023Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual
CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)7 August 2023License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)
ML23178A08310 July 2023Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs
ML23150A24725 May 2023NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods
CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)4 May 2023Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)
ML23116A14921 April 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods
WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)10 April 2023Revised Pressure and Temperature Limits Report (PTLR)
ML23072A0655 April 2023Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12
ML23052A03622 February 2023February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides
CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.124 January 2023Response to Request for Additional Information Request to Revise Technical Specification 3.4.12
CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)27 July 2022Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual11 May 2022Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual
CNL-22-005, Revision to Watts Bar Nuclear Plant, Unit 2, Reactor Vessel Surveillance Capsule Withdrawal Schedule24 January 2022Revision to Watts Bar Nuclear Plant, Unit 2, Reactor Vessel Surveillance Capsule Withdrawal Schedule
WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)9 December 2021Revised Pressure and Temperature Limits Report (PTLR)
ML21148A10017 June 2021Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology
WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)16 December 2020Revised Pressure and Temperature Limits Report (PTLR)
CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)14 August 2020License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)
CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)27 July 2020Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)
ML20143A16928 May 2020Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2
ML20134J01014 May 2020Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)10 October 2019License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)
ML18347B33022 May 2019Issuance of Amendment Regarding Revision to Watts Bar Unit 2 Technical Specification 4.2.1 Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage
L-19-026, Revised Pressure and Temperature Limits Report (PTLR)4 April 2019Revised Pressure and Temperature Limits Report (PTLR)
L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual19 March 2019Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual
CNL-18-067, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)12 October 2018Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)
ML18180A2185 July 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018
ML18040A4349 February 2018Submittal of Revised Limits Report (PTLR) Pressure and Temperature
ML17353A19221 December 2017Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018
NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 201821 December 2017Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018
ML17312A26020 November 2017Revision to the Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML17313A1289 November 2017Revised Pressure and Temperature Limits Report (PTLR)
ML17306A8022 November 2017Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual
ML17334A1702 November 2017Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System
CNL-17-112, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule5 September 2017Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML16215A2273 August 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016
NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20163 August 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016
ML16113A07722 April 2016Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual
ML15282A05131 October 2015NUREG-0847, Supp. 29, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority.
ML15251A58722 October 2015Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant, Unit 2
ML15301A14022 October 2015Current Facility Operating License NPF-96, Tech Specs, Revised 11/08/2017
ML15279A27211 September 2015Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System11 September 2015Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System
ML15229A19531 August 2015NUREG-0847, Supplement 28 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 Docket Number 50-391 Tennessee Valley Authority
IR 05000391/201560514 August 2015IR 05000391/2015605, May 17, 2015 June 30, 2015, Watts Bar Nuclear Plant, Unit 2, Integrated Report
IR 05000390/201560514 August 2015IR 05000391/2015605, May 17, 2015 June 30, 2015, Watts Bar Nuclear Plant, Unit 2, Integrated Report
CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 1327 July 2015Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13
ML15033A04131 January 2015NUREG-0847 Supplement 27, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2.
ML14307A9813 November 2014Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual
CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 122 September 2014Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12