Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000285/201900512 March 2020Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 050-00285/2019-005 and 072-00054/2019-001
IR 05000285/201600418 January 2017NRC Integrated Inspection Report 05000285/2016004
IR 05000285/20160038 November 2016NRC Integrated Inspection Report Number 05000285/2016003
IR 05000285/20160025 August 2016NRC Integrated Inspection Report 05000285/2016002, April 1, 2016 Through June 30, 2016
LIC-16-0046, Transmittal of Lnservice Testing (IST) Program Plan Fifth Ten-Year Interval, June 7, 2016 - June 6, 20268 June 2016Transmittal of Lnservice Testing (IST) Program Plan Fifth Ten-Year Interval, June 7, 2016 - June 6, 2026
IR 05000285/201600120 April 2016NRC Integrated Inspection Report Number 05000285/2016001
IR 05000285/201600711 February 2016NRC Confirmatory Action Letter Follow Up Inspection 05000285/2016007
IR 05000285/201500921 January 2016NRC Problem Identification and Resolution Inspection Report 05000285/2015009
IR 05000285/20150048 January 2016NRC Integrated Inspection Report Numbers 05000285/2015004 and 07200054/2015001
LIC-15-0119, ISFSI - Quality Assurance Program Approval for Radioactive Material Packages9 December 2015ISFSI - Quality Assurance Program Approval for Radioactive Material Packages
IR 05000285/201500310 November 2015IR 05000285/2015003; on 7/01/2015 9/30/2015; Fort Calhoun Station, Operability Determinations, Other Activities
IR 05000285/201501124 September 2015IR 05000285/2015011, June 29, 2015 Through August 14, 2015, Fort Calhoun Station
LIC-15-0077, License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements31 August 2015License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements
IR 05000285/201500230 July 2015IR 05000285/2015002; 4/01/2015 - 6/30/2015; Fort Calhoun Station, Integrated, Inservice Inspection Activities, EAL and Emergency Plan Changes, Follow-up of Events
IR 05000285/201500716 April 2015IR 05000285/2015007, on 02/09/2015 - 03/13/2015, Fort Calhoun Station, Component Design Basis Inspection (CDBI)
IR 05000285/201500812 March 2015IR 05000285/2015008; 01/26/2015 - 01/30/2015; Fort Calhoun Station; Follow-up of Events and Notices of Enforcement Discretion, Operability Determinations and Functionality Assessments, Problem Identification and Resolution
IR 05000285/201400512 February 2015IR 05000285/2014005; on 10/01/2014 - 12/31/2014; Fort Calhoun Station, Maintenance Effectiveness, Maintenance of Emergency Preparedness
IR 05000285/201301825 November 2014IR 05000285/2013018; on 07/08/2013 - 10/15/2014; Fort Calhoun Station, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input and Notice of Violation
IR 05000285/201400413 November 2014IR 05000285/2014004; on 07/01/2014 - 09/30/2014; Fort Calhoun Station, Operability Determinations and Functionality Assessments, Plant Modifications
IR 05000285/201400918 September 2014IR 05000285/2014009 and Notice of Violation, July 7 Through September 12, 2014, Fort Calhoun, NRC Confirmatory Action Letter Follow Up Inspection and Problem Identification and Resolution
IR 05000285/201400327 August 2014Errata to IR 050002852014003; 04/01/2014 - 06/30/2014; Fort Calhoun Station; Radiological Hazard Assessment and Exposure Control
LIC-14-0077, CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision17 June 2014CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision
IR 05000285/201400714 May 2014IR 05000285-14-007; on 02/16/2014 - 03/31/2014; Fort Calhoun Station; Integrated Resident Inspection Report and Confirmatory Action Letter Closeout Items
IR 05000285/201301725 April 2014IR 05000285-13-017, July 8, 2013 Through March 13, 2014, Fort Calhoun Station - Manual Chapter 0350 Inspection Report and Final Significance Determination of White Finding and Notice of Violation
IR 05000285/20130158 November 2013IR 05000285-13-015; 08/11/2013 - 09/30/2013; on Fort Calhoun Station, Integrated Resident and Regional Report; Emergency Action Level and Emergency Plan Changes
IR 05000285/20130059 August 2013IR 05000285-13-005, on 05/19/2013 - 06/30/2013, Fort Calhoun Station, Integrated Resident and Regional Report, Radiological Hazard Assessment and Exposure Control, ALARA Planning and Controls, In-plant Airborne Radioactivity Control and Mit
IR 05000285/201300816 July 2013IR 05000285-13-008, on 01/14/2013 06/10/2013, Fort Calhoun Station, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input
IR 05000285/201301224 May 2013IR 05000285-13-012; 01/29/2013 - 04/11/2013; Fort Calhoun Station; Special Inspection Report; IP 93812; Design Control and Corrective Action Violations
IR 05000285/201300310 May 2013IR 05000285-13-003, 02/17/2013 - 03/31/2013, Fort Calhoun Station, Integrated Resident and Regional Report
IR 05000285/201201214 February 2013IR 05000285-12-012; 11/18/2012 - 12/31/2012; Fort Calhoun Station (Fcs), Integrated Resident and Regional Report; Emergency Plan Biennial; Auxiliary Feedwater Team Inspection; and Fire Protection
IR 05000285/201201131 December 2012IR 05000285-12-011; 10/01/2012 - 11/18/2012; Fort Calhoun Station, Integrated Resident and Regional Report; and Radiological Hazard and Exposure Control
IR 05000285/20120095 July 2012IR 05000285-12-009; on 06/04-07/2012; Fort Calhoun Station, Post-Approval Site Inspection for License Renewal
IR 05000285/201100616 March 2012IR 05000285-11-006; Omaha Public Power District; on November 14, 2011, ?February 2, 2012; Fort Calhoun Station Biennial Team Inspection of the Identification and Resolution of Problems.
IR 05000285/201100210 May 2011IR 05000285-11-002; 01/01/2011 - 03/31/2011; Fort Calhoun Station, Integrated Resident and Regional Report; Adverse Weather Protection, Refueling and Other Outage Activities, and Surveillance Testing
IR 05000285/200900714 July 2009IR 05000285-09-007, on April 27 Through June 24, 2009 for Fort Calhoun Station Biennial Baseline Inspection of the Identification and Resolution of Problems
IR 05000285/200800924 September 2008IR 05000285-08-009 on 07/28 08/15/2008 for Fort Calhoun, Fire Protection
IR 05000285/200700511 February 2008IR 05000285-07-005, on 10/01/2007 - 12/31/2007, Fort Calhoun Station, Integrated Resident and Regional Report, Adverse Weather Protection, Flood Protection Measures, Maintenance Effectiveness, Operability Evaluations, Permanent Plant Modifi
IR 05000285/200700413 November 2007IR 05000285-07-004; 07/01/2007- 09/30/2007; Fort Calhoun Station, Integrated Resident and Regional Report, Identification and Resolution of Problems
IR 05000285/200701026 October 2007IR 05000285-07-010; on 08/27/2007 - 09/14/2007; Omaha Public Power District; Fort Calhoun Station, Biennial Inspection of the Identification and Resolution of Problems
IR 05000285/20070077 September 2007IR 05000285-07-007, on 05/14 Through 07/25/2007, Fort Calhoun Station; Component Design Basis Inspection
IR 05000285/20070068 May 2007IR 05000285-07-006; Omaha Public Power District; 02/20/2007 Through 04/09/2007; Fort Calhoun Station, Special Inspection to Evaluate Abb Circuit Breaker Failures
IR 05000285/200600514 February 2007IR 05000285-06-005; 10/01/2006 - 12/31/2006; Fort Calhoun Station, Integrated Resident and Regional Report; Operability Evaluations, Refueling and Other Outage Activities, Access Control to Radiologically Significant Areas, ALARA Planning A
IR 05000285/200600414 November 2006IR 05000285-06-004; on 07/01/2006 - 9/30/2006; Omaha Public Power District, Fort Calhoun Station; Permanent Plant Modifications, Refueling and Other Outage Activities, Access Control to Radiologically Significant Areas, Other Activities
IR 05000285/20050097 December 2005IR 05000285-05-009; 9/12/2005 - 11/30/2005; Fort Calhoun Station; Biennial Baseline Inspection of Problem Identification and Resolution
IR 05000285/200300817 June 2003IR 05000285-03-008; on 04/28 - 05/08/03, for Omaha Public Power District, Fort Calhoun Station; Biennial Baseline Inspection of the Problem Identification and Resolution
IR 05000285/19980198 January 1999Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility
IR 05000285/199701529 September 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/97-15 on 970815
IR 05000285/19950248 February 1996Insp Rept 50-285/95-24 on 951217-960127.Violations Noted. Major Areas Inspected:Operational Safety Verification,Plant Support Activities,Maint & Surveillance Observations,Onsite Engineering & Open Item Followup
Information Notice 1994-54, Failures of General Electric Magne-Blast Circuit Breakers to Latch Closed1 August 1994Failures of General Electric Magne-Blast Circuit Breakers to Latch Closed
IR 05000285/199300127 January 1993Insp Rept 50-285/93-01 on 930104-08.No Violations Noted. Major Areas inspected:self-assessment Capability to Determine Licensee Organization & Programs Effective at Problem Identification & Correction