Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20311A461 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000277/2016003 | 3 November 2016 | Integrated Inspection Report 05000277/2016003 and 05000278/2016003 |
IR 05000277/2015003 | 9 November 2015 | IR 05000277/2015003, 05000278/2015003, Integrated Inspection Report and IR 07200029/2015001, Independent Spent Fuel Storage Installation Report - Peach Bottom Atomic Power Station |
IR 05000277/2014004 | 7 November 2014 | IR 05000277/2014004, 05000278/2014004; 07/01/2014-09/30/2014; Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3; Fire Protection, Surveillance Testing, and Maintaining Emergency Preparedness |
IR 05000277/2013005 | 4 February 2014 | IR 05000277-13-005, 05000278-13-005; 10/01/2013 - 12/31/2013; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Integrated Inspection Report |
IR 05000277/2012004 | 14 November 2012 | IR 05000277-12-004 and 05000278-12-004; Peach Bottom Atomic Power Station, 07-01-12 - 09-30-12; NRC Integrated Inspection Report |
IR 05000277/2011005 | 10 February 2012 | IR 05000277-11-005, 05000278-11-005; Exelon Generation Company, LLC; on 10/01/2011 - 12/31/2011; Peach Bottom Atomic Power Station - NRC Integrated Inspection Report |
IR 05000277/2008003 | 12 August 2008 | IR 05000277-08-003 & IR 05000278-08-003; on 04-01-08 - 06-30-08, Peach Bottom Atomic Power Station, Integrated Inspection Report |
IR 05000277/2005002 | 5 May 2005 | IR 05000277-05-002, 05000278-05-002 on 01/01/2005 - 03/31/2005 for Peach Bottom Atomic Power Station, Units 2 and 3; Maintenance Effectiveness, Operability Evaluations, and Cross-Cutting Areas |