Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20339A01320 November 20209 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8
ML20339A02520 November 20209 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5
ML20339A06520 November 20209 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Sections 6.1 Through 6.6
ML19150A46510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8
ML19150A46810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Thru 6.6
ML19150A47810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5
ML18334A21630 November 2018Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018
ML20311A5506 November 20172017 Q1-Q4 ROP Inspection Findings
ML16180A1585 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML16180A1645 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML16180A1565 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML16180A1285 May 2016Revision 26 to the Updated Final Safety Analysis Report - Table of Contents
RS-16-006, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)4 January 2016Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
IR 05000244/201400225 April 2014IR 05000244-14-002; 01/01/2014 - 03/31/2014; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Maintenance Effectiveness; Operability Determinations and Functionality Assessments; Drill Evaluation; Follow-Up of Events and Notices of Enforcement
ML13067A32828 February 2013R. E. Ginna - License Amendment Request to Revise Section 3.6.5 of the Technical Specifications, Containment Air Temperature
ML09210030210 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 7, Instrumentation and Controls Through Chapter 10, Steam and Power Conversion System
ML09210030110 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 4, Reactor Through Chapter 6, Engineered Safety Features
ML06138024911 July 2006Table of Contents, Safety Evaluation Related to Extended Power Uprate at R. E. Ginna Nuclear Power Plant
ML04251011918 August 2004Summary of Meeting with Constellation Energy Group Regarding Proposed Extended Power Uprate
ML04055027130 July 2003to Specification ME-326, Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System Design, Fabrication, & Installation Specification.