LIC-15-0119, ISFSI - Quality Assurance Program Approval for Radioactive Material Packages9 December 2015ISFSI - Quality Assurance Program Approval for Radioactive Material Packages
LIC-15-0098, Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events27 August 2015Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
LIC-14-0077, CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision17 June 2014CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision
IR 05000285/201400714 May 2014IR 05000285-14-007; on 02/16/2014 - 03/31/2014; Fort Calhoun Station; Integrated Resident Inspection Report and Confirmatory Action Letter Closeout Items
ML13317A58325 November 2013Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
IR 05000285/201200227 June 2012Acknowledgement of Receipt of Denial Violation in NRC Inspection Report 05000285/2012002
LIC-11-0017, License Amendment Request (LAR) 10-06, Proposed Change to Establish the Ultimate Heat Sink (UHS) Limiting Condition for Operation (LCO) and Addition of UHS Level and Temperature Surveillance Requirements4 March 2011License Amendment Request (LAR) 10-06, Proposed Change to Establish the Ultimate Heat Sink (UHS) Limiting Condition for Operation (LCO) and Addition of UHS Level and Temperature Surveillance Requirements
LIC-08-0021, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors29 February 2008Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
LIC-07-0083, Response to Request for Additional Information for License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic.31 August 2007Response to Request for Additional Information for License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic.
ML07215029330 July 2007License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic.
LIC-06-0038, Response to Fort Calhoun, Unit 1 - Request for Additional Information Related to License Amendment Request for Updated Safety Analysis Report Clarification of Operator Action During Loss of Main Feedwater Event6 July 2006Response to Fort Calhoun, Unit 1 - Request for Additional Information Related to License Amendment Request for Updated Safety Analysis Report Clarification of Operator Action During Loss of Main Feedwater Event