Issue date | Title | |
---|---|---|
LIC-15-0119, ISFSI - Quality Assurance Program Approval for Radioactive Material Packages | 9 December 2015 | ISFSI - Quality Assurance Program Approval for Radioactive Material Packages |
LIC-15-0098, Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 27 August 2015 | Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
LIC-14-0077, CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision | 17 June 2014 | CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision |
IR 05000285/2014007 | 14 May 2014 | IR 05000285-14-007; on 02/16/2014 - 03/31/2014; Fort Calhoun Station; Integrated Resident Inspection Report and Confirmatory Action Letter Closeout Items |
ML13317A583 | 25 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
IR 05000285/2012002 | 27 June 2012 | Acknowledgement of Receipt of Denial Violation in NRC Inspection Report 05000285/2012002 |
LIC-11-0017, License Amendment Request (LAR) 10-06, Proposed Change to Establish the Ultimate Heat Sink (UHS) Limiting Condition for Operation (LCO) and Addition of UHS Level and Temperature Surveillance Requirements | 4 March 2011 | License Amendment Request (LAR) 10-06, Proposed Change to Establish the Ultimate Heat Sink (UHS) Limiting Condition for Operation (LCO) and Addition of UHS Level and Temperature Surveillance Requirements |
LIC-08-0021, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 29 February 2008 | Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
LIC-07-0083, Response to Request for Additional Information for License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic. | 31 August 2007 | Response to Request for Additional Information for License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic. |
ML072150293 | 30 July 2007 | License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic. |
LIC-06-0038, Response to Fort Calhoun, Unit 1 - Request for Additional Information Related to License Amendment Request for Updated Safety Analysis Report Clarification of Operator Action During Loss of Main Feedwater Event | 6 July 2006 | Response to Fort Calhoun, Unit 1 - Request for Additional Information Related to License Amendment Request for Updated Safety Analysis Report Clarification of Operator Action During Loss of Main Feedwater Event |