Issue date | Title | |
---|---|---|
ML23143A391 | 23 May 2023 | Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements |
ML22090A098 | 31 March 2022 | Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements |
IR 05000528/2021002 | 9 August 2021 | Integrated Inspection Report 05000528/2021002, 05000529/2021002, and 05000530/2021002 and Exercise of Enforcement Discretion |
ML16365A240 | 30 December 2016 | Emergency License Amendment Request to Extend Diesel Generator 3B Completion Time |
ML16356A689 | 21 December 2016 | Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time |
ML16054A012 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 4 of 8 |
ML16054A008 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 8 |
ML16054A014 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 6 of 8 |
ML15364A034 | 24 December 2015 | Final Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML15218A300 | 31 July 2015 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 1, Risk-Informed Completion Times |
ML14177A645 | 27 June 2014 | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
ML13136A022 | 28 February 2013 | APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13025A283 | 29 January 2013 | NRC Comments on Draft Integrated Plans, Palo Verde |
ML13015A256 | 17 December 2012 | Draft Submittal February 2013 FLEX Integrated Plan - Palo Verde |
ML13081A096 | 30 June 2011 | Updated Final Safety Analysis Report, Revision 16. Chapter 7, Instrumentation & Controls. |
ML102360335 | 12 August 2010 | Response to July 21, 2010, Request for Additional Information Regarding Metal Fatigue for the Review of the License Renewal Application, and License Renewal Application Amendment No. 22 |
ML060690486 | 23 February 2006 | Supplement to Emergency Amendment to Technical Specifications 3.7.8, Essential Spray Pond System (Esps) and 3.8.1, AC Sources - Operating. |
ML17300B307 | 31 March 1999 | Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee. |
ML17305A539 | 14 February 1990 | LER 89-018-01:on 891026,discovered That Containment Purge Valves Did Not Meet Local Leak Rate Testing Acceptance Criteria.Caused by Intergranular Stress Fracture.Spiral Pins Replaced.Reportable Per Part 21.W/900214 Ltr |
ML20206B213 | 31 March 1987 | Technical Specifications for Palo Verde Nuclear Generating Station,Unit 3.Docket No. 50-530.(Arizona Public Service Company) |
ML17303A181 | 1 December 1986 | Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept. W/861208 Ltr |
ML20129J778 | 19 February 1985 | Forwards Std Accident Monitoring Instrumentation Tech Specs, Incorporating Heated Junction Thermocouple Sys & C-E Design for Reactor Vessel Level Monitoring Sys.Tech Specs Based on Tech Specs Approved by NRC for Palo Verde Unit 1 |
ML20039G843 | 31 December 1981 | Palo Verde Nuclear Generating Station Units 1,2 and 3 Auxiliary Feedwater System Reliability Study Evaluation |
ML17296B131 | 25 September 1980 | Vol II of III of Transcript of 800925 & 26 Sys Review of Palo Verde Nuclear Generating Station Equipment Qualification,Before Equipment Qualification Review Board. Pp 214-389 |
ML18192B830 | 3 February 1975 | Environmental Report Construction Permit Stage, Volume IV for Palo Verde Nuclear Generating Station, Units 1, 2, & 3. |