Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23107A06131 March 20236 to Updated Final Safety Analysis Report, Chapter 1, Introduction & General Description of Plant
PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme12 July 2022License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme
ML14105A37222 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
ML13365A26410 February 2014Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML14030A2076 February 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Palisades Nuclear Plant, TAC No.: MF0768
PNP 2013-010, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
PNP 2013-017, Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks25 February 2013Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks
PNP 2013-015, Entergy Nuclear Operations, Inc. Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks21 February 2013Entergy Nuclear Operations, Inc. Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks
PNP 2012-071, Response to Request for Additional Information License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks6 September 2012Response to Request for Additional Information License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks
ML12122A07114 May 2012Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206
IR 05000255/201101013 May 2011IR 05000255-11-010, on 03/23/2011 - 04/29/2011, Palisades Nuclear Plant Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML09182027530 June 2009Palisades, Follow-up Supplemental Response to NRC Generic Letter 2004-02
IR 05000254/20080075 December 2008IR 05000254-08-007, 05000265-08-007(DRS), on 09/22/2008 - 10/24/2008, Quad Cities Nuclear Power Station, Units 1 and 2, Component Design Bases Inspection (CDBI)
ML08063025327 February 2008Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-Water Reactors
ML0725500574 October 2007Issuance of Amendment 228 Proposal to Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity
ML07278017120 September 2007Response to Request for Additional Info. Re License Amendment Request for ECCS Surveillance Requirements
ML07072076820 March 2007Encl 2 - Director'S Decision DD-07-02 to 03/20/07 - Ltr T Lodge, Counsel for Petitioners, Issuance of Director'S Decision Under 10 CFR 2.206 - Palisades Nuclear Plant, Docket Nos. 72-7, 50-255
ML07072076720 March 2007Encl 1 - Staff'S Response to Petitioner'S Comments to 03/20/07 - Ltr T Lodge, Counsel for Petitioners, Issuance of Director'S Decision DD-07-02 Under 10 CFR 2.206 - Palisades Nuclear Plant, Docket Nos. 72-7, 50-255
ML07072076320 March 2007Ltr T Lodge, Counsel for Petitioners, Issuance of Director'S Decision DD-07-02 Under 10 CFR 2.206 - Palisades Nuclear Plant, Docket Nos. 72-7, 50-255
ML06325000428 November 2006Enclosure - Proposed Director'S Decision for Comment to 11/28/06 Ltrs Re Request for Comments on Proposed Directors'S Decision - Palisades Nuclear Plant (72-7)
ML06271030031 October 2006NUREG-1437, Suppl 27, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Palisades Nuclear Plant, (Final)
ML06271007428 September 2006Safety Evaluation Report: Related to the License Renewal of Palisades Nuclear Plant
ML06179045027 June 2006G20060369 - 06/27/06 - Ltr. to T.J. Lodge, Counsel for Petitioners Re Review Consideration of 10 CFR 2.206 Petition Regarding Palisades Nuclear Plant
ML18065A75722 May 1996Rev 1 to IPEEE Rept, Per GL 88-20
ML18064A83230 June 1995IPE of External Events (Ipeee).
ML0604802311 September 1994Independent NRC Staff Final Safety Assessment of Dry Spent Fuel Cask Storage Facility at Palisades Nuclear Power Plant Site
ML06048023423 May 1994Transcript of May 23, 1994 Public Meeting with Palisades. Pages 1-124
ML18059B12631 December 19931993 Annual Rept of Facility Changes,Tests & Experiments.
ML18059A54124 November 1993LER 93-012-00:on 931103,concluded That Seismic Qualification Did Not Exist for Relays Previously Installed in Chp & Chr Circuits Due to Undersized Relay Coils.Undersized Coils in Relays replaced.W/931124 Ltr
ML20086T2778 June 1990Rev 0 to Scope Document, Reactor Protection Sys Trip Unit Assembly & RPS Power Supply Assembly Upgrade
ML18051A8373 April 1984Submits Supplemental Evaluation & Response to Seismic Design Consideration,Sep Topic III-6 (NUREG-0820,Section 2.4)
ML18044A3738 November 1979Project Requirements for Plant Power Conversion Sys Relief Valve Position Indication. Supporting Documentation Encl
ML18347A78030 November 1976Spent Fuel Pool Modification Description and Safety Analysis.
ML18344A28424 June 1975Responding to Letter of 4/25/1975. Provides Report of Piping Support Systems Review as Description of Scope and Extent of Engineering Evaluation of Pipe Hangers and Restrains